Water System Design Sample Clauses

Water System Design. This task will include the design of the waterlines and preparation of the documents for the 60%, 90% and 100% submittals. The design will be for the replacement of the existing waterlines and appurtenances along Newport Ave. from College Way to 9th St. and along Nashville from 9th St. to Pageant Park. The preparation of the plan and profile sheets will be for the following improvements on Newport Ave.:  Install approximately 4,500 linear feet of waterline and associated appurtenances within project limits  Provide connection details for existing waterline laterals at College Way, Knoxville, NW Juniper, 14th , 12th, 11th, 10th, 9th, 8th, Federal, Columbia, Xxxxxx and Xxxxx.  Replacement of the 18-inch water main at 10th and Newport will be an early work package to accommodate construction during low demands. Assumptions:  Proposed waterline sizes to be determined by external contract,  Design includes replacement of 18-inch waterline located at 00xx Xxxxxx and Newport and the evaluation of alternate routes  Contractor will be responsible for development of temporary water service connection plan and uninterrupted service to customers  12 internal team coordination meetings included in this sub-task  Water system plans will include 9 plan sheets, 1 sheet for design of the 18-inch line and 1 sheet for details for a total of 11 sheet  Material of 18-inch waterline is unknown  Existing waterlines will be removed
AutoNDA by SimpleDocs
Water System Design. A. Except as specified in the WSFFA, all water system facilities (on and off‐site) required for service to The Xxxxxx Hills MPD shall be designed and Constructed by the Master Developer, in accordance with the Xxxxxx Hills Conceptual Water Plan (Figure 7.2A), and the Black Diamond Engineering Design and Construction Standards (Exhibit “E”) and will become part of the City’s system upon acceptance by the Designated Official.

Related to Water System Design

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services.

  • Access to Project Site Redeveloper shall permit the representatives of the City to enter Project Site at any and all reasonable times, as the City may deem necessary for the purposes of this Redevelopment Agreement, including but not limited to work and inspection of all work being performed in connection with the construction of the Redeveloper Improvements. Similarly, the City shall permit Redeveloper such entry upon the public rights of way for such purposes. No compensation shall be payable nor shall any charges be made in any form by any party for the access or inspection provided for in this Section. The City’s right of access granted under this Section shall terminate upon issuance by the City of the Redeveloper’s Certificate of Completion of Redeveloper Improvements. Notwithstanding the above, Redeveloper shall not be relieved of the provisions contained in Chapter 14.29 of the Lincoln Municipal Code regarding the use of streets for private construction purposes.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • System Access CUSTOMER agrees to provide to PROVIDER, at CUSTOMER’S expense, necessary access to the mainframe computer and related information technology systems (the “System”) on which CUSTOMER data is processed during the times (the “Service Hours”) specified in the PSAs, subject to reasonable downtime for utility outages, maintenance, performance difficulties and the like. In the event of a change in the Service Hours, CUSTOMER will provide PROVIDER with at least fifteen (15) calendar days written notice of such change.

  • LAYOUT OF WORK The Contractor shall lay out its Work from base lines and benchmarks indicated on the Drawings, and shall be responsible for verification of all measurements in connection with the layout. The Contractor shall furnish all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the Work. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by Princeton University until authorized to remove them. If such marks are destroyed by the Contractor or through its negligence before their removal is authorized, Princeton University may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor. CLAUSE C15 NOISE

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.