Project Limits Sample Clauses

Project Limits. The physical limits given in the Contract showing the points of beginning and ending of the Work included in the Project. Proposal. A Bidder’s written offer to perform Work at quoted prices. Qualified Products List. A listing of specific materials which have been pre-qualified for use on Projects and is contained in the Materials Sampling Guide.
AutoNDA by SimpleDocs
Project Limits. ‌ This project is divided into three main sections. The Kentucky Approach (Section 4) extends along KY 841 from Sta. 0+99.72 to Sta. 187+51.86 (back). Section 5 is the Ohio River Bridge Main Spans, which begins at KY 841 Sta. 187+40.00 (ahead) and ends at Sta. 212+74.51 (“Kentucky Approach”). The Indiana Approach (Section 6) extends along SR 265 from Sta. 212+74.51 to Sta. 428+63.00 (“Indiana Approach”). These limits and stationing are general in nature and are only intended to provide the design intent as indicated in the Reference Information Documents (RID). See Section 9 for more detailed limits of the work. References within the Technical Provisions to Sections 4, 5, and 6 that are not underlined refer to the East End Crossing Sections (“Section”) described above and are not to be construed as PPA Document cross-references. Developer scope of work for the East End Crossing does not include the proposed Salem Road design and construction; including the proposed bridge over SR 265 depicted in the RID RD- 6.11 through RD-6.24 (see INDOT Construction Contract IR-34937). Section 1.2.2 describes coordination requirements related to this work.
Project Limits. This Project is a corridor improvement to US 90, LA 318, and associated frontage roads in St. Xxxx Xxxxxx. The Project consists of the reconstruction of the mainline of US 90 (Future I-49), reconstruction of LA 318, and providing a frontage road system. The Project includes a new grade separated interchange at the existing LA 318 intersection. The Project limits along US 90 extend approximately 6,000 feet northwest to approximately 3,000 feet southeast of the existing LA 318 intersection. The length of reconstruction of LA 318 is approximately 2,000 feet southwest and approximately 2,700 feet northeast of US 90.
Project Limits. CONSULTANT shall perform and/or supply all necessary services as specified in this Agreement within the boundaries of SEMSWA or as otherwise directed in writing by SEMSWA.
Project Limits. The project limits are in the City of Burbank within one mile of the State Route 134 freeway.
Project Limits. This Project consists of design and development work and does not include implementation, final design or construction. It will further development of a CBOSS/PTC system that, once implemented, will provide vital overlay of its existing wayside block signal and centralized traffic control systems on the mainline tracks between the northern terminal located at 4th and King Street Station in San Francisco and CP Lick south of San Xxxx.
Project Limits. Provide a description of the location and extent of the proposed project and the impacts to the upstream and downstream areas. Establish whether or not the project is located within the study limits of the Xxxxxxx County watershed studies.
AutoNDA by SimpleDocs
Project Limits. PROJECT is defined more specifically as that area of drainageway extending from approximately to approximately , see Exhibit A.
Project Limits. The intersection of Grand Mission Boulevard and Grand Bellaire Boulevard
Project Limits. CONTRACTOR shall perform and/or supply all of the material, supplies, tools, equipment, labor and, other services necessary for completion of the construction services as specified in this Contract within the boundaries of SEMSWA or as otherwise directed in writing by SEMSWA.
Time is Money Join Law Insider Premium to draft better contracts faster.