Transition Period LVRT Standard Sample Clauses

Transition Period LVRT Standard. The transition period standard applies to wind generating plants subject to FERC Order 661 that have either: (i) interconnection agreements signed and filed with the Commission, filed with the Commission in unexecuted form, finally executed as conforming agreements, or filed with the Commission as non-conforming agreements between January 1, 2006 and December 31, 2006, with a scheduled in-service date no later than December 31, 2007, or (ii) wind generating turbines subject to a wind turbine procurement contract executed prior to December 31, 2005, for delivery through 2007.
AutoNDA by SimpleDocs
Transition Period LVRT Standard. The transition period standard applies to wind generating plants subject to FERC Order 661 that have either: (i) interconnection agreements signed and filed with the Commission, filed with the Commission in unexecuted form, finally executed as conforming agreements, or filed with the Commission as non-conforming agreements between January 1, 2006 and December 31, 2006, with a scheduled in-service date no later than December 31, 2007, or (ii) wind generating turbines subject to a wind turbine procurement contract executed prior to December 31, 2005, for delivery through 2007. Wind generating plants are required to remain in-service during three-phase faults with normal clearing (which is a time period of approximately 4 – 9 cycles) and single line to ground faults with delayed clearing, and subsequent post-fault voltage recovery to prefault voltage unless clearing the fault effectively disconnects the generator from the system. The clearing time requirement for a three-phase fault will be specific to the wind generating plant substation location, as determined by and documented by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected. The maximum clearing time the wind generating plant shall be required to withstand for a three-phase fault shall be 9 cycles at a voltage as low as 0.15 p.u., as measured at the high side of the wind generating plant step-up transformer (i.e. the transformer that steps the voltage up to the transmission interconnection voltage or “GSU”), after which, if the fault remains following the location-specific normal clearing time for three-phase faults, the wind generating plant may disconnect from the transmission system. This requirement does not apply to faults that would occur between the wind generator terminals and the high side of the GSU or to faults that would result in a voltage lower than 0.15 per unit on the high side of the GSU serving the facility. Wind generating plants may be tripped after the fault period if this action is intended as part of a special protection system. Wind generating plants may meet the LVRT requirements of this standard by the performance of the generators or by installing additional equipment (e.g., Static VAr Compensator, etc.) within the wind generating plant or by a combination of generator performance and additional equipment. Existing individual generator units that are, or have been, interconnected to the network at the sa...
Transition Period LVRT Standard. All wind generation facilities subject to Commission Order No. 661 and not covered by the transition period described above must meet the following requirements:
Transition Period LVRT Standard. All wind Generating Facilities subject to FERC Order No. 661 and not covered by the transition period described above , as well as inverter-based Generating Facilities must meet the following requirements:
Transition Period LVRT Standard. The transition period standard applies to wind generating plants subject to FERC Order 661 that have either: (i) interconnection agreements signed and filed with the Commission, filed with the Commission in unexecuted form, or filed with the Commission as non-conforming agreements between January 1, 2006 and December 31, 2006, with a scheduled in-service date no later than December 31, 2007, or (ii) wind Southwest Power Pool Second Revised Sheet No. 555 FERC Electric Tariff Superseding First Revised Sheet No. 555 Fifth Revised Volume No. 1 5. Existing individual generator units that are, or have been, interconnected to the Transmission System at the same location at the effective date of the Appendix G LVRT Standard are exempt from meeting the Appendix G LVRT Standard for the remaining life of the existing generation equipment. Existing individual generator units that are replaced are required to meet the Appendix G LVRT Standard

Related to Transition Period LVRT Standard

  • Transition Period Due to the nature of our purchasing process, the District often requires an existing service provider to continue to provide goods and/or services while the District is in the process of advertising, evaluating, and awarding a contract for the provision of the same goods and/or services in the future. To accommodate this process, the Contractor shall agree to maintain the same terms and conditions set forth in this Agreement for a period up to ninety (90) days after the automatic termination of this Agreement at the end of its term, if requested by the District, as a transition period. In addition, if the Contractor is not the successful bidder for a future solicitation for the same or similar services, he or she shall agree to provide the same goods and/or services provided in this Agreement for a period up to ninety (90) days to allow for an orderly transition to the new provider. The District and the Contractor may mutually agree to a longer transition period.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Retention periods Documentation which serves as evidence of orderly and proper data processing must be retained by ATOSS in accordance with the applicable statutory retention periods beyond the end of the contract. To relieve itself of this obligation, ATOSS may turn said documentation over to the Customer at the end of the contract.

  • Contract Transition Upon Contract expiration or termination, the Contractor shall ensure a seamless transfer of Contract responsibilities with any subsequent Contractor necessary to transition the Products and services of the Contract. The incumbent Contractor assumes all expenses related to the contract transition.