SYSTEMS INTEGRATION PROGRESS MEETINGS Sample Clauses

SYSTEMS INTEGRATION PROGRESS MEETINGS. A. Progress Meetings shall be held by the Design-Builder monthly in the Washington Metropolitan Area starting 10 Days after receipt of the Design-Builder written responses to Arlington County and WMATA’s design review comments on the intermediate Systems Integration Design. The purpose of these meetings will be to clarify the comments, update Authority personnel on the systems integration issues, resolve interface definitions or systems integration issues, and exchange ideas and information. Meeting intervals can be revised by the WMATA Representative, if deemed appropriate.
AutoNDA by SimpleDocs

Related to SYSTEMS INTEGRATION PROGRESS MEETINGS

  • Construction Progress Meetings The Design Professional shall attend Construction Progress Meetings periodically held by the Contractor at the Site on a schedule determined by the Contractor. The Design Professional shall review the minutes of the meeting and provide his written comments to the minutes to the Owner and Contractor within seven calendar days after receipt of the meeting minutes.

  • Progress Meetings The Engineer shall from time to time during the progress of the work confer with the State. The Engineer shall prepare and present such information as may be pertinent and necessary or as may be requested by the State in order to evaluate features of the work.

  • Project Managers; Meetings 10.1 Promptly following the Effective Date, each Party shall designate a Project Manager responsible for coordinating the Party’s Work and shall provide the other Party with a written notice containing the name and contact information of such Project Manager (“Project Manager”). In no event shall any Project Manager be authorized to amend or modify the provisions of this Agreement. Each Party may change its Project Manager, from time to time, by written notice to the other Party.

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia:

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Preparatory Contract Negotiations Meetings Where operational requirements permit, the Employer will grant leave without pay to an employee to attend preparatory contract negotiations meetings.

  • Procurement Plan 8. The Borrower shall update the Procurement Plan as needed throughout implementation of the Project, and on each anniversary of the Effective Date, the Borrower shall in consultation with ADB determine whether the Procurement Plan needs to be updated. The Borrower shall implement the Procurement Plan in the manner in which it has been approved by ADB.

  • Innovative Scheduling Schedules which are inconsistent with the Collective Agreement provisions may be developed in order to improve quality of working life, support continuity of resident care, ensure adequate staffing resources, and support cost-efficiency. The parties agree that such innovative schedules may be determined locally by the Home and the Union subject to the following principles:

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

Time is Money Join Law Insider Premium to draft better contracts faster.