System Mission Assurance Sample Clauses

System Mission Assurance. The U.S. signatories to this TAA are committed to the successful deployment and operation of the F-7/C-2 system. To facilitate assurance of this success, the U.S. signatories will review the system, spacecraft, payloads, and ground network design through analyses, independent assessments, and review of test data. In addition, the U.S. signatories will review plan and process documentation for manufacturing, testing, integration, and verification activities. Reports on these activities, to include areas of concern or insufficiency, will be provided to the foreign signatories.
AutoNDA by SimpleDocs

Related to System Mission Assurance

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR Other services: 130 thousand SDR List of Entities which procure the services, specified in Annex 4:

  • Network Resource Interconnection Service (check if selected)

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • Prevention Care Services and Early Detection Services See Prevention and Early Detection Services section for details. 0% Not Covered Private Duty Nursing Services* Must be performed by a certified home health care agency. 0% - After deductible Not Covered

  • Station Service Seller shall be responsible for arranging and obtaining, at its sole risk and expense, any station service required by the Facility that is not provided by the Facility itself.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Application Services Under an “Application Services” engagement, we will assist you with defining, developing and deploying end-to-end enterprise or departmental applications; tasks may include determining the optimal technology approach and caching strategy to deliver effective, high-performance applications; leveraging a best practice approach for building new applications which includes conducting user workshops, building wireframes, iterating, testing, documenting and mentoring to increase adoption; and enhancing, optimizing or redesigning existing applications for improved user experience, faster performance or extended functionality.

  • SYSTEM OPERATION The Parties shall adhere to any applicable operational requirements of PJM necessary to protect the integrity of the transmission system within the PJM Control Area and the transmission systems of interconnected control areas, and shall satisfy any and all PJM, RFC and NERC criteria, when applicable. The DS Supplier shall also adhere to any applicable operational requirements of the Company necessary to protect the integrity of the Company’s local distribution system.

Time is Money Join Law Insider Premium to draft better contracts faster.