Summary of Overall Progress Sample Clauses

Summary of Overall Progress. The project has made excellent progress in supporting vaccination activities at fixed posts and at outreach sites in collaboration with health workers. Progress has also been made with increased vaccine coverage for children under five and with women of child-bearing age, through the support provided by the Mobile Brigades at the outreach sites. To date, all project assisted health facilities (health centers and health posts) have trained MCH nurses, APEs, and TBAs on site, to support program activities at health facilities and community levels. Both the APEs and TBAs are promoting disease prevention and the utilization of health services. The TBAs are also assisting mothers during deliveries and promoting child spacing. Trained CLC members and the theatre groups are also contributing to the promotion of hygiene, disease prevention, and maternal and child health activities in rural communities.
AutoNDA by SimpleDocs

Related to Summary of Overall Progress

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • Overall Project Schedule The Construction Progress Schedule that is approved by the Owner.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • Progress The Engineer shall, from time to time during the progress of the work, confer with the County. The Engineer shall prepare and present such information as may be pertinent and necessary, or as may be requested by the County, in order to evaluate features of the work. Upon request by the County, the Engineer shall make presentations to the Commissioners Court. At the request of the County or the Engineer, conferences shall be held at the Engineer’s office, the County’s office, or at other locations designated by the County. These conferences shall also include an evaluation of the Engineer’s services and work when requested by the County. Should the County determine that the progress in production of the work does not satisfy the work schedule, the County will review the work schedule with the Engineer to determine corrective action needed. The Engineer shall promptly advise the County in writing of events which have a significant impact upon the progress of work, including:

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Final Plans On or before thirty (30) days following the date of full execution of this Lease, Landlord shall submit to Tenant two (2) sets of Landlord’s proposed space and construction plans and specifications prepared by Landlord’s architect, for the Tenant Improvements, Within three (3) business days after receipt of Landlord’s plans and specifications Tenant shall either: (a) evidence its approval by endorsement on one (1) set of said plans and specifications (and return such signed or initialed set to Landlord); or (b) indicate those revisions or corrections which Tenant requires and the reasons therefor; provided Landlord shall not be obligated to accept any revisions which Landlord shall reasonably determine: (i) do not conform to the standards of design, motif and decor reasonably established or adopted by Landlord for the Building; (ii) would subject Landlord or the Premises to any additional cost, expense, liability, violation, fine, penalty, or forfeiture; would adversely affect the reputation, character, or nature of the Building; (iii) would provide for or require any installation of work which is or might be unlawful, create an unsound or dangerous condition, adversely affect the structural soundness of the Premises or Building; (iv) interfere with or abridge the use and enjoyment of any adjoining or other space in the Building, or (v) is of a special use or nature with little or no residual value (unless Tenant agrees to pay for such improvements and the removal thereof upon the expiration or earlier termination of this Lease). Landlord shall, within five (5) days thereafter, submit four (4) sets of proposed plans and specifications, as so revised or corrected, to Tenant for its approval in accordance with this paragraph, which plans will then be considered the final plans (the “Final Plans”). The Final Plans may subsequently be amended by Tenant provided that significant changes will require Landlord’s prior written approval, which approval shall be given or reasonably refused within five (5) business days after receipt of such amended plans and specifications and, provided further that if such change order will delay the anticipated Commencement Date specified in Section 1 of the Lease the change order shall be considered a Tenant Delay (as hereinafter defined). The parties will work cooperatively to complete the plan approval process expeditiously.

  • LOT OVERVIEW This Contract encompasses the Lots listed in Appendix D – Contractor and Reseller Information. The following descriptions, as applicable, delineate the scope of the awarded Lots.