STRIPPING OF TOPSOIL Sample Clauses

STRIPPING OF TOPSOIL. 1 Commence topsoil stripping of areas as directed by Project Coordinator after area has been cleared. .2 Strip topsoil to depths as directed by Project Coordinator. Avoid mixing topsoil with subsoil where textural quality will be moved outside acceptable range of intended application. .3 Stockpile in locations as directed by Project Coordinator. Stockpile height not to exceed 3-m. .4 Protect stockpiles from contamination and compaction.
AutoNDA by SimpleDocs
STRIPPING OF TOPSOIL. 1 Do not handle topsoil while in wet or frozen condition or in any manner in which soil structure is adversely affected as determined by Project Coordinator. .2 Commence topsoil stripping of areas as directed by Project Coordinator after area has been cleared. .3 Strip topsoil to depths as directed by Project Coordinator. Avoid mixing topsoil with subsoil.

Related to STRIPPING OF TOPSOIL

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Toileting the ability to use the lavatory or otherwise manage bowel and bladder functions so as to maintain a satisfactory level of personal hygiene;

  • Vaccination and Inoculation (a) The Employer agrees to take all reasonable precautions, including in-service seminars, to limit the spread of infectious diseases among employees.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

  • RUNNING OF THE ACADEMY Teachers and staff