Site Control Plan Sample Clauses

Site Control Plan. The City shall submit for DTSC’s review and approval a Site Control Plan within ninety (90) days of the effective date of this Agreement. The purpose of the Site Control Plan shall be to identify measures designed to prevent unauthorized persons from entering onto portions of the Site where such entry could pose a threat to themselves or others or where such entry could interfere with the investigation or remediation activities at the Site. The plan shall set forth a schedule for implementation of such measures. The City shall implement the plan in accordance with that schedule. The City shall review the plan annually and revise it as required by DTSC.
AutoNDA by SimpleDocs

Related to Site Control Plan

  • Quality Control Plan Within forty five (45) days after the design development documents are approved, the Design-Builder shall develop a quality control plan for the Project (the “Quality Control Plan”). A draft of the Quality Control Plan shall be submitted to the Department and shall be subject to the Department’s review and approval. The Quality Control Plan shall be tailored to the specific products/type of construction activities contemplated by the GMP Basis Documents, and in general, shall include a table of contents, quality control team organization, duties/responsibilities of quality control personnel, submittal procedures, inspection procedures, deficiency correction procedures, documentation process, and a list of any other specific actions or procedures that will be required for key elements of the Work.

  • Site Control In the total loss of building use scenario, what likely exists will be a smoking pile of rubble. This rubble will contain many components that could be dangerous. It could also contain any personnel on the premises at the time of the disaster. For these reasons, the local fire marshal with the assistance of the police will control the site until the building is no longer a threat to surrounding properties and the companies have secured the site from the general public. During this time, the majority owner of the building should be arranging for a demolition contractor to mobilize to the site with the primary objective of reaching the cable entrance facility for a damage assessment. The results of this assessment would then dictate immediate plans for restoration, both short term and permanent. In a less catastrophic event, i.e., the building is still standing and the cable entrance facility is usable, the situation is more complex. The site will initially be controlled by local authorities until the threat to adjacent property has diminished. Once the site is returned to the control of the companies, the following events should occur. An initial assessment of the main building infrastructure systems (mechanical, electrical, fire and life safety, elevators, and others) will establish building needs. Once these needs are determined, the majority owner should lead the building restoration efforts. There may be situations where the site will not be totally restored within the confines of the building. The companies must individually determine their needs and jointly assess the cost of permanent restoration to determine the overall plan of action. Multiple restoration trailers from each company will result in the need for designated space and installation order. This layout and control is required to maximize the amount of restoration equipment that can be placed at the site, and the priority of placements. Care must be taken in this planning to ensure other restoration efforts have logistical access to the building. Major components of telephone and building equipment will need to be removed and replaced. A priority for this equipment must also be jointly established to facilitate overall site restoration. (Example: If the AC switchgear has sustained damage, this would be of the highest priority in order to regain power, lighting, and HVAC throughout the building.) If the site will not accommodate the required restoration equipment, the companies would then need to quickly arrange with local authorities for street closures, rights of way or other possible options available.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic DHCS PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than 24 hours.

  • Quality Control Program The Contractor shall describe the Quality Control Program in a written document which shall be reviewed by the Engineer prior to the start of any production, construction, or off-site fabrication. The written Quality Control Program shall be submitted to the Engineer for review at least ten (10) calendar days before the start of construction. The Quality Control Program shall be organized to address, as a minimum, the following items:

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Safety Plan Developer’s safety plan specifically adapted for the Project. Developer's Safety Plan shall comply with all provisions regarding Project safety, including all applicable provisions in these Construction Provisions.

  • Monitoring Plan keep up with the objectives from the cadetship practice booklet; taking daily notes as well as learning new information every day; currently reporting to the supervisor. Evaluation plan: the final result should be in accordance with the traineeship’s aims and objectives, achieving an improvement of specialty knowledge and language skills. The level of language competence9 in English that the trainee already has or agrees to acquire by the start of the mobility period is: A1 ☐ A2 ☐ B1 ☐ B2 ☒ C1 ☐ C2 ☐ Native speaker ☐ Table B - Sending Institution Please use only one of the following three boxes: 10 The traineeship is embedded in the curriculum and upon satisfactory completion of the traineeship, the institution undertakes to:Award ……...…ECTS credits (or equivalent)11 Give a grade based on: Traineeship certificate ☒ Final report ☒ Interview ☐ Record the traineeship in the trainee's Transcript of Records and Diploma Supplement (or equivalent). Record the traineeship in the trainee's Europass Mobility Document: Yes ☒ No ☐ The traineeship is voluntary and, upon satisfactory completion of the traineeship, the institution undertakes to: Award ECTS credits (or equivalent): Yes ☐ No ☐ If yes, please indicate the number of credits: …. Give a grade: Yes ☐ No ☐ If yes, please indicate if this will be based on: Traineeship certificate ☐ Final report ☐ Interview ☐ Record the traineeship in the trainee's Transcript of Records: Yes ☐ No ☐ Record the traineeship in the trainee's Diploma Supplement (or equivalent). Record the traineeship in the trainee's Europass Mobility Document: Yes ☐ No ☐ The traineeship is carried out by a recent graduate and, upon satisfactory completion of the traineeship, the institution undertakes to: Award ECTS credits (or equivalent): Yes ☐ No ☐ If yes, please indicate the number of credits: …. Record the traineeship in the trainee's Europass Mobility Document (highly recommended): Yes ☐ No ☐ Accident insurance for the trainee The Sending Institution will provide an accident insurance to the trainee (if not provided by the Receiving Organisation/Enterprise): Yes ☐ No ☒ The accident insurance covers: - accidents during travels made for work purposes: Yes ☐ No ☒ - accidents on the way to work and back from work: Yes ☐ No ☒