Shadow Builder Sample Clauses

Shadow Builder. ‌ The Shadow Builder (SB) is a tool that will transparently instrument the code to benchmark. The tools will be able to output an “instrumented code” that will be compiled as a normal code. The following steps describe what the Shadow Builder process flow is: • Get configuration file from the user (Benchmarking Configuration File) • Get appropriate sources • Execute Trace Framework Abstraction Configuration file • Parse the sources file needed • Injecting code • Compile the targeted binary for different platform, • If needed, depending on what type of benchmark is undertaken, compile another target binary benchmarked. The SB (Shadow Builder) is meant to be as transparent as possible for the user. And if the benchmarking is not activated, it should be bypassed. # Source code • Shadow Builder: – Git repository: xxxxx://xxxxxx.xxx/micro-ROS/benchmarking_shadow-builder [4] – Path relative to the repository: ./shadow-builder • Trace Framework Abstraction Core: – Git repository: xxxxx://xxxxxx.xxx/micro-ROS/benchmarking_shadow-builder [4] – Path relative to the repository: ./tfa_core • Trace Framework Abstraction Plugins: – Git repository: xxxxx://xxxxxx.xxx/micro-ROS/benchmarking_shadow-builder [4] – Path relative to the repository: ./tfa-plugin • Tutorial on how to write a Trace Framework Abstraction Plugin: – Git repository: xxxxx://xxxxxx.xxx/micro-ROS/benchmarking_shadow-builder/tr ee/master/tutorial/01_create_plugin_time [3] • Patched NuttX: – Git repository: xxxxx://xxxxxx.xxx/micro-ROS/NuttX [5]. • Patched NuttX applications: – Git repository: xxxxx://xxxxxx.xxx/micro-ROS/nuttx_apps [6]. • Multi-Connectors Board: – Git repository: xxxxx://xxxxxx.xxx/micro-ROS/mcb [7]. • Other benchmark tools over Serial Wire Debug: – Git repository: xxxxx://xxxxxx.xxx/microROS/benchmarking [8]. # Hardware used This was covered in the deliverable 5.5 - Section 4.1 xxxxx://xxxxxx.xxx/micro-ROS/benchmar king-results/blob/master/pdfs/OFERA_56_D5.5_Micro-ROS_benchmarking_and_validatio n_tools_Release_-_Beta.pdf[9]
AutoNDA by SimpleDocs
Shadow Builder. ‌ This section will introduce some concept related to the Shadow Builder (SB). The Shadow Builder is a tool that will transparently instrument the code to benchmark. The tools will be able to output an “instrumented code” that will be later be compiled as a normal code. The following steps describe what the shadow builder process flow: • Get configuration file from the user (Benchmarking Configuration File). • Get appropriate sources. • Execute Trace Framework Abstraction Configuration file. • Parse the sources file needed then injects the code. • Compile the targeted binary for different platform. • If needed, depending what type benchmark is undertaken, compile another target binary benchmarking. The SB (Shadow Builder) is meant to be as transparent as possible for the user. And if the benchmark- ing is not activated, it should be bypassed. The SB is in charge of getting the path/git repository to the source code that needs to be benchmarking. The sources are specified by the user in the bench- marking configuration file. In order to inject code, there are some tools that allow this. Clang AST tool will allow to inject some code. Figure 3: Shadow building

Related to Shadow Builder

  • Design-Builder The person or entity responsible for the proper completion of the activities described in the Contract Documents and who executes the Contract.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Construction Manager The individual, partnership, corporation, joint venture, or any combination thereof, or its authorized representative, named as such by the District. If no Construction Manager is used on the Project that is the subject of this Contract, then all references to Construction Manager herein shall be read to refer to District.

  • Contractor If COUNTY elects to renegotiate this Agreement due to reduced or terminated 20 funding, CONTRACTOR shall not be obligated to accept the renegotiated terms.

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Architect Engineer shall provide assistance to Owner through the commissioning consultant/agent for the purpose of advising and counseling Owner’s personnel in the usage, operation and maintenance of the building mechanical, electrical, and plumbing systems.

  • Contractor’s Contract Manager The Contractor’s Contract Manager, who is primarily responsible for the Contractor’s oversight of the Contract performance, will be identified in a separate writing to the Department upon Contract signing in the following format: Contractor’s Contract Manager Name Contractor’s Name Contractor’s Physical Address Contractor’s Telephone # Contractor’s Email Address If the Contractor changes its Contract Manager, the Contractor will notify the Department. Such a change does not require an amendment to the Contract.

  • CONTRACTOR CUSTOMER SERVICE REPRESENTATIVE Contractor shall designate a customer service representative (and inform Enterprise Services of the same) who shall be responsible for addressing Purchaser issues pertaining to this Master Contract.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

Time is Money Join Law Insider Premium to draft better contracts faster.