Req AR – Architecture Requirements‌ Sample Clauses

Req AR – Architecture Requirements‌. These requirements raise the need of federation support from the CMFs and the support of typical abstractions used to accomplish the federation such as slices for accountability and clearinghouse for authentication. Therefore, several of these requirements are seen just as if the CMFs provide the mechanisms to do it, not the way the federation, messages and semantics, is going to be done. All the federation detailed discussion and specifications are going to be considered in WP4. Requirement XXXXXX FOAM OMF ProtoGENI I&M XXXXXX I&M OMF I&M ProtoGENI Req AR01 Req AR02 Req AR03 Req AR04 Req AR05 Req AR06 Req AR07 Req AR08 Req AR09 Req AR10 Req AR11 Req AR12 Req AR13 Req AR14 Req AR15 Req AR16 Req AR17 Req AR18 Req AR19 Req AR20 Req AR21 Req AR22 Req AR23 Req AR24 Req AR25 Req AR26 Req AR Req AR28 AR7, AR8, AR9 - Since the beginning, Expedient and GENI (and XXXXXX) we designed to support users from outside (the Internet) to participate in some experiment within the experimental infrastructure. Therefore, this makes possible also for one experiment participate, or be the input, for other experiment using a web interface (opt-in users). This is something planned to be tested in the XXXXXX, and later this functionality could be incorporated. AR11 - After discussion with the evaluators, we got a consensus that in AR11, XXXXXX has the mechanism support of SFA in the aggregate manager level, and SFA is an open interface. Therefore, it is fully supported. AR12 - It is related to measurements and addressed in Section 7.2 (FIBRE-BR Monitoring Integration Approach). AR14 - This requirement is about out-of-band network management, such that allocation of resources, routing and signalling can be done without affecting the rest of the requirements. Although this is supported by default in ProtoGENI, it was verified that depending how the islands are structured with separated control and management networks, this can be supported by all CMFs.
AutoNDA by SimpleDocs

Related to Req AR – Architecture Requirements‌

  • Information Technology Enterprise Architecture Requirements If this Contract involves information technology-related products or services, the Contractor agrees that all such products or services are compatible with any of the technology standards found at xxxxx://xxx.xx.xxx/iot/2394.htm that are applicable, including the assistive technology standard. The State may terminate this Contract for default if the terms of this paragraph are breached.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • Interface Requirements 9.3.1 BellSouth shall offer LIDB in accordance with the requirements of this subsection.

  • CERTIFICATION REGARDING DRUG-FREE WORKPLACE REQUIREMENTS The undersigned (authorized official signing for the contracting organization) certifies that the contractor will, or will continue to, provide a drug-free workplace in accordance with 45 CFR Part 76 by:

  • Project Requirements Failure to comply with the following requirements will result in a suspension of all other operations:

  • DBE Requirements A. Notice is hereby given to the CONSULTANT and any SUB-CONSULTANT, and both agree, that failure to carry out the requirements set forth in 49 CFR Sec. 26.13(b) shall constitute a breach of this Contract and, after notification and failure to promptly cure such breach, may result in termination of this Contract or such remedy as INDOT deems appropriate. The referenced section requires the following assurance to be included in all subsequent contracts between the CONSULTANT and any SUB-CONSULTANT: The CONSULTANT, sub recipient or SUB-CONSULTANT shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Contract. The CONSULTANT shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this Contract, which may result in the termination of this Contract or such other remedy, as INDOT, as the recipient, deems appropriate.

  • Quality Assurance Requirements There are no special Quality Assurance requirements under this Agreement.

  • DRUG-FREE WORKPLACE REQUIREMENTS Contractor will comply with the requirements of the Drug-Free Workplace Act of 1990 and will provide a drug-free workplace by taking the following actions:

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

Time is Money Join Law Insider Premium to draft better contracts faster.