Pre Use Survey of Roads Bridges Sample Clauses

Pre Use Survey of Roads Bridges. Section 4.1 As soon as practicable after the execution of this Agreement, but in any event, prior to the commencement of the Developer’s project, the Developer(s) shall select a third party NYS licensed Civil Engineering firm appearing on the current approved NYS LDSA lists, to conduct the survey explained in section 4.3 and 4.4 below. Roads and highways within the boundaries of the County anticipated to be used as Designated Haul Routes plus any roads anticipated to serve on a one time basis or roads which could be added as Designated Haul Routes will be assessed as described below. A representative from the Engineering Firm shall meet with the County Designee and the County Bridge Engineer prior to data collection to review how the data will be collected and reported. The County shall agree and approve the data collection process and the report formats. The Pre-use survey shall be done after the signing of the Road Use Agreement, during the three month period before construction begins. Roads will be posted to heavy traffic if the road use agreement is not executed on time, no exceptions.
AutoNDA by SimpleDocs
Pre Use Survey of Roads Bridges 

Related to Pre Use Survey of Roads Bridges

  • Red Hat Directory Server Use Cases Subscription Services are provided for Red Hat Directory Server only when used for its supported Use Case in accordance with the terms of this Exhibit and Table 3.1 below.

  • Software Use Case Red Hat Enterprise Linux Developer Suite Subscription Services for Red Hat Enterprise Linux Developer Suite are available for Development Purposes only.

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Secondary / Post-Secondary Program Alignment Welding HIGH SCHOOL COURSE SEQUENCE 9th Grade 10th Grade 11th Grade 12th Grade English 9 Algebra I World History/Geography Biology World Language Phys Ed/Health English 10 Geometry U.S. History/Geography Physics or Chemistry World Language Visual/Performing/Applied Arts English 11 Algebra II Civics/Economics Welding English 12 Math Credit Science Credit Welding WASHTENAW COMMUNITY COLLEGE Welding Associate in Applied Science Semester 1 Math Elective(s)* 3 WAF 105 Introduction to Welding Processes 2 WAF 111 Oxy-fuel Welding 4 WAF 112 Shielded Metal Arc Welding 4 Semester Total 13 Semester 2 Speech Elective(s) 3 WAF 106 Blueprint Reading for Welders 3 WAF 123 Advanced Oxy-fuel Welding 4 WAF 124 Advanced Shielded Metal Arc Welding 4 Semester Total 14 Semester 3 Arts/Human. Elective(s) 3 Computer Lit. Elective(s) 3 WAF 215 Advanced Gas Tungsten Arc Welding 4 WAF 288 Gas Metal Arc Welding 4 Semester Total 14 Semester 4 WAF 200 Layout Theory Welding 3 WAF 210 Welding Metallurgy 3 Soc. Sci. Elective(s) 3 WAF 226 Specialized Welding Procedures 4 Semester Total 13 Semester 5 Nat. Sci. Elective(s) 4 WAF 227 Basic Fabrication 3 WAF 229 Shape Cutting Operations 3 Writing Elective(s) 3 Semester Total 13 Program Totals 67

  • Summer Session A. All ASEs employed in the Summer Session shall receive the same general range adjustment as ASEs received in the preceding Fall term.

  • Project Location & Description The Project, for which the provision of financial assistance is the subject of this Agreement, is hereby described as follows:

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • Software Subscription Use Case Red Hat Storage Server for On- Premise Red Hat Storage Server for On-Premise is intended to be used as a storage system and will be supported only when used as a storage node. Red Hat Storage Server is not supported on non- server hardware such as desktops or workstations. Red Hat Storage Server for On-Premise is intended for use on a dedicated System, Physical Node, Virtual Node or Virtual Guest; running other applications and/or programs of any type on the System, Physical Node, Virtual Node or Virtual Guest can have a negative impact on the function and/or performance of the Red Hat Storage Server and is not a supported Use Case. Each Red Hat Storage Server Subscription includes one Software Subscription to Red Hat Enterprise Linux Server and the Scalable File System Add-on, which are supported solely in connection with the use of Red Hat Storage Server. Red Hat Storage Server for Public Cloud Red Hat Storage Server for Public Cloud is intended to be used as a storage system and will be supported only when used as a storage node. When running in Amazon Web Services, an EC2 M1 Large dedicated instance is required in order to be supported. Running other applications and/or programs of any type on the same instance can have a negative impact on the function and/or performance of the Red Hat Storage Server and is not a supported Use Case. Each Red Hat Storage Server Subscription includes one Software Subscription to Red Hat Enterprise Linux Server and the Scalable File System Add-on, which are supported solely in connection with the use of Red Hat Storage Server. Red Hat Storage for Red Hat Enterprise Linux OpenStack Platform Red Hat Storage Server for Red Hat Enterprise Linux OpenStack Platform is intended to be used as a storage system with Red Hat Enterprise Linux OpenStack Platform and will be supported only when used as a storage node. Red Hat Storage Server is not supported on non-server hardware such as desktops or workstations. Red Hat Storage Server for Red Hat Enterprise Linux OpenStack Platform is intended for use on a dedicated Physical Node; running other applications and/or programs of any type on the Physical Node can have a negative impact on the function and/or performance of the Red Hat Storage Server and is not a supported Use Case. Each Red Hat Storage Server Subscription includes one Software Subscription to Red Hat Enterprise Linux Server and the Scalable File System Add-on, which are supported solely in connection with the use of Red Hat Storage Server.

Time is Money Join Law Insider Premium to draft better contracts faster.