NDWRF Side-Stream Nutrient Reduction Facilities Sample Clauses

NDWRF Side-Stream Nutrient Reduction Facilities. This scope for detailed design is based on design of either the Kruger AnitaMox or World Water Works DEMON deammonification sidestream treatment to the NDWRF sidestream treatment process. The Engineer will work with City to select one manufacturer prior to 30% design. The new deammonification sidestream treatment facilities will treat dewatering filtrate from the existing Solids Handling Building to reduce the ammonia and total nitrogen loads to the NDWRF BNR process. Sidestream treatment will return the treated filtrate flow to the treatment process downstream of the primary clarifiers via the Low Lift Pump Station. The existing Plant A Intermediate Settling Tanks 1-6 shall be reconfigured to serve as equalization and treatment tanks for this process. Process air will be provided from the main blower facilities at Plant B. The equalization portion of the tankage shall be covered but not odor scrubbed. Filtrate piping at the existing belt filter presses shall be modified to capture the filtrate separate from the belt filter press washwater. Piping shall be provided to route filtrate to the sidestream treatment equalization tanks. Motorized valves shall be provided to allow filtrate to bypass the sidestream treatment process during startup and shutdown of the dewatering process. The process electrical facilities for this system will be located in the Plant A electrical building (or Solids Handling Building as determined in final design), and the control panel will be at the treatment tanks. A caustic storage and feed facility will be provided for sidestream treatment and Plant A odor control. Major equipment, influent flow to the process, etc. shall be monitored through the City’s existing SCADA system. Design shall be completed to 30% under this contract.
AutoNDA by SimpleDocs

Related to NDWRF Side-Stream Nutrient Reduction Facilities

  • CONSTRUCTION OF THE BUS TERMINAL 12.1 Obligations prior to commencement of construction Prior to commencement of Construction Works, the Concessionaire shall:

  • Access to the Work The Design Professional and its representatives shall have access to the Work at all times while it is in progress, and shall comply with all job site safety rules.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Attachment Facilities Not applicable, because there are no CTOAFs for the Merchant Transmission Facility that are covered by this Agreement.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • OGS Centralized Contract Terms and Conditions have been renumbered as depicted in the following chart: Current Amended Section Title 4.25 4.26 Severability 4.26 4.27 Entire Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.