MEPS Panel 19 Weight Development Process Sample Clauses

MEPS Panel 19 Weight Development Process. The person-level weight for MEPS Panel 19 was developed using the 2014 MEPS Round 1 person-level weight as a “base” weight. For key, in-scope members who joined an RU after Round 1, the Round 1 family weight served as a “base” weight. The weighting process included an adjustment for nonresponse over the remaining data collection rounds in 2014 as well as raking to the same population control figures for December 2014 used for the MEPS Panel 18 weights for key, responding persons in-scope on December 31, 2014. The same five variables employed for Panel 18 raking (census region, MSA status, race/ethnicity, sex, and age) were used for Panel 19 raking. Again, the final weight for key, responding persons who were not in- scope on December 31, 2014 but were in-scope earlier in the year was the person weight after the nonresponse adjustment. Note that the MEPS Round 1 weights for both panels incorporated the following components: a weight reflecting the original household probability of selection for the NHIS and an adjustment for NHIS nonresponse; a factor representing the proportion of the 16 NHIS panel-quarter combinations eligible for MEPS; the oversampling of certain subgroups for MEPS among the NHIS household respondents eligible for MEPS; ratio-adjustment to NHIS-based national population estimates at the household (occupied DU) level; adjustment for nonresponse at the DU level for Round 1; and poststratification to U.S. civilian noninstitutionalized population estimates at the family and person level obtained from the corresponding March CPS databases.
AutoNDA by SimpleDocs
MEPS Panel 19 Weight Development Process. The person-level weight for MEPS Panel 19 was developed using the 2014 full-year weight for an individual as a “base” weight for survey participants present in 2014. For key, in-scope members who joined an RU some time in 2015 after being out-of-scope in 2014, the initially assigned person-level weight was the corresponding 2014 family weight. The weighting process included an adjustment for person-level nonresponse over Rounds 4 and 5 as well as raking to population control totals for December 2015 for key, responding persons in-scope on December 31, 2015. These control figures were derived by scaling back the population distribution obtained from the March 2016 CPS to reflect the December 31, 2015 estimated population total (estimated based on Census projections for January 1, 2016). Variables used for person-level raking included: census region (Northeast, Midwest, South, West); MSA status (MSA, non- MSA); race/ethnicity (Hispanic; Black non-Hispanic; Asian non-Hispanic; and other); sex; and age. (Poverty status is not included in this version of the MEPS full year database because of the time required to process the income data collected and then assign persons to a poverty status category). The final weight for key, responding persons who were not in-scope on December 31, 2015 but were in-scope earlier in the year was the person weight after the nonresponse adjustment.

Related to MEPS Panel 19 Weight Development Process

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • CONSTRUCTION INDUSTRY DEVELOPMENT & PROMOTION FUND 19.01 The Employer shall contribute to the Union’s Construction Industry Development and Promotion Fund (the “Industry Fund”) the amount identified at Schedule “A” for each hour worked by each employee covered by this Agreement, and it shall remit such contributions to the Union together with union dues, and in the manner described in the Remittances to the Union article and in the Union’s remittance directives.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Program Development NWESD agrees that priority in the development of new applications services by XXXXX shall be in accordance with the expressed direction of the XXXXX Board of Directors operating under their bylaws.

Time is Money Join Law Insider Premium to draft better contracts faster.