Manufacturing Facilities and Capacity Requirements Sample Clauses

Manufacturing Facilities and Capacity Requirements. Supplies of the Collaboration Product for preclinical and clinical trials and commercialization activities will be manufactured in the facilities currently being used for the manufacture of the Collaboration Products as of the Date of Execution. The Parties acknowledge that in the event that the Steering Committee determines that it is necessary or advisable to use a New Facility for the manufacture of the Collaboration Products, the capital costs therefor shall be borne by GTC and Genzyme pursuant to Sections 1.36, 1.41 and 4.1.3 hereof. The Steering Committee shall approve the design and capacity requirements for the New Facility.
AutoNDA by SimpleDocs

Related to Manufacturing Facilities and Capacity Requirements

  • Quality Requirements Supplier shall comply with Tesla’s quality requirements set forth in Attachment 6 entitled “Tesla Motors Supplier Handbook”.

  • Facilities and Equipment 4 (a) Facilities..................................................4 (b) Maintenance.................................................4 (c)

  • Functional Requirements The EPDS shall perform the following functions under the Conditions and Operational Scenarios specified below:

  • Changes in Equipment, Systems, Etc USBFS reserves the right to make changes from time to time, as it deems advisable, relating to its systems, programs, rules, operating schedules and equipment, so long as such changes do not adversely affect the services provided to the Trust under this Agreement.

  • Technical Requirements All Corrections done by Customer, its Authorized Agent or a third party contractor must be performed in accordance with Boeing's applicable service manuals, bulletins or other written instructions, using parts and materials furnished or approved by Boeing.

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Utilities and Supplies Manager shall enter into or renew contracts for electricity, gas, steam, landscaping, fuel, oil, maintenance and other services as are customarily furnished or rendered in connection with the operation of similar rental property in the area.

  • Emergency Generator Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three (3) xxxxx per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

Time is Money Join Law Insider Premium to draft better contracts faster.