LABORATORY SINKS Sample Clauses

LABORATORY SINKS. Vulcathene black injuction moulded poly propylene sink with self-draining base and an outlet to accept the wastedescribed below as cat No . 602 complete with vultex labline bench mounted 1 way outlet fitting with inlet for supply and side valve having swivel nozzle and spout vulcathene 11/2 waste plug back nut butyl rubber gasket grating and chain as NO. 504 VULCATHENE anti - siphonbottle trap . as cat no w561 NO NO NO 1 1 22 Carried to Collection - Carried to Collection - TEM DESCRIPTION UNIT QTY RATE AMOUNT LABORATORY GAS INSTALLATION L.P gas storage tank of capacity 13kgs L.P gas supply 13KG 25mm diameter HG plastic conduits as sleeve for copper pipes 25mm diameter plastic bends 25mm diameterplastic tee Back nuts and nozzles as Vultex Labline Ref No VL2110/D l.p gas pressure gauge 50mm diameter GMS Mainfold pipe with 3no branches tappings to gas cylinder complete with mounting plugs COPPER TUBING 6/8 mm diameter copper tubing 8/10 DIA 10/12 DIA Extra over copper tubing for the following fittings 6/8 mm diameter brass equal tee 8/10mm ditto 10/12 DITTO 8/10 x 6/8mm dia brass unequal xxxx 10/12 x 8/10 mm diameter brass reducer 8/10 x 6/8mm ditto NO NO LM NO NO NO NO NO LM LM LM NO NO NO NO NO NO 1 1 74 14 8 25 2 1 74 32 24 27 14 12 27 14 12 A B C D E F G H A B C D E F G H J Carried to Collection -
AutoNDA by SimpleDocs
LABORATORY SINKS. The Concessionaire shall provide and fix vitreous China laboratory sink with rubber pluge 40mm C.P. brass waste and 40mm C.P. brass trap as per item 17.15 of SOR. Quantity and quality to be got approved by Independent Engineer before fixing.

Related to LABORATORY SINKS

  • Secondary Schools a. Department Chairs (Department Heads) are primarily curricular. The job descriptions include but are not limited to the duties listed.

  • Transporting Students Teachers shall not be required to transport a student in a private vehicle on behalf of the school.

  • Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.

  • Lockers Where working conditions or weather requires regular employees to have additional clothing available at their regular point of assembly, the Employer shall provide appropriate secure individual lockers within the assembly room building.

  • Přetrvající platnost This Section 3 “

  • Overbuilds Sprint will not provide non-discriminatory access to FTTH Loop or FTTC Loop on an unbundled basis when Sprint has deployed a FTTH Loop or FTTC Loop parallel to, or in replacement of, an existing loop facility, except that:

  • MINISTRY/SCHOOL BOARD INITIATIVES ETFO will be an active participant in the consultation process to develop a Ministry of Education PPM regarding Ministry/School Board Initiatives.

  • As-Builts Seller shall provide final as-built drawings of the Seller-Owned Interconnection Facilities within 30 Days of the successful completion of the Acceptance Test.

  • Porcupine Site Highway 11

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

Time is Money Join Law Insider Premium to draft better contracts faster.