Inspection and Make-Ready Work Sample Clauses

Inspection and Make-Ready Work. All charges for surveys, inspections, engineering, rodding, swabbing placement and removal of cable, and any other charges for work performed for Licensee or fees paid by Licensor on account of Licensee’s presence in the conduit system shall be based upon the full cost to Licensor for performing such work plus a premium of thirty-five percent (35%) will be added to Licensor’s full costs incurred in performing such work for Licensee. The cost to Licensor shall EXHIBIT D (page 2) include the costs of all materials, supplies, engineering, labor (including overtime and board and lodging, where necessary to meet the Licensee’s requirements), supervision, transportation, taxes, general overhead, including appropriate loadings for such things as relief and pension accruals, social security taxes, vacations, holidays, sickness, workmen’s compensation, and any other items associated with the work that are chargeable to the Licensor’s accounts under the Uniform System of Accounts applicable to the Licensor as prescribed by the Federal Communications Commission.
AutoNDA by SimpleDocs

Related to Inspection and Make-Ready Work

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner.

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.

  • Inspection of Work It is FIRST PARTY's obligation to make the work product available for CITY's inspections and periodic reviews upon request by CITY.

  • INSPECTION/TESTING All Products sold pursuant to this Agreement will be subject to inspection/testing by or at the direction of H- GAC and/or the ordering Customer, either at the delivery destination or the place of manufacture. In the event a Product fails to meet or exceed all requirements of this Agreement, and unless otherwise agreed in advance, the cost of any inspection and/or testing, will be the responsibility of the Contractor.

  • Preconstruction Phase Services Preconstruction Phase Services shall mean all services described in Article 3.1, and any similar services described in the Request for Proposals, including such similar services as are described in the Construction Manager at Risk’s Response to the Request for Proposals to the extent they are accepted by Owner, but excluding any Early Work. Early Work shall be considered part of Construction Phase Services.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Inspections The Servicer shall inspect the Mortgaged Property as often as deemed necessary by the Servicer in accordance with Accepted Servicing Practices to assure itself that the value of the Mortgaged Property is being preserved. In addition, if any Mortgage Loan is more than 45 days delinquent, the Servicer promptly shall inspect the Mortgaged Property and shall conduct subsequent inspections in accordance with Accepted Servicing Practices or as may be required by the primary mortgage guaranty insurer. Upon request, the Servicer shall produce an electronic report of each such inspection.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Access to the Work The Design Professional and its representatives shall have access to the Work at all times while it is in progress, and shall comply with all job site safety rules.