Geotechnical and Seismic Conditions Sample Clauses

Geotechnical and Seismic Conditions. Treasure Island proper (excluding most of Yerba Buena Island) is comprised of artificially constructed lands that were created using non-engineered fill. As a result, unless substantial geotechnical and infrastructure improvements are made, Treasure Island is expected to perform poorly in a major earthquake. The primary geotechnical concerns from earthquake-induced hazards include soil liquefaction and lateral spreading. Thus, the Project has been designed to improve seismic safety and to meet all applicable building and seismic safety standards. The Infrastructure Plan referenced in Section IV.B below describes the various geotechnical techniques that will be employed to seismically stabilize the perimeter of Treasure Island and prepare the Property for development.
AutoNDA by SimpleDocs

Related to Geotechnical and Seismic Conditions

  • Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.

  • Specific Conditions If applicable, specific conditions required after a risk assessment will be included in Exhibit G. Grantee shall adhere to the specific conditions listed therein.

  • GEOGRAPHIC AREA AND SECTOR SPECIFIC ALLOWANCES, CONDITIONS AND EXCEPTIONS The following allowances and conditions shall apply where relevant: Where the company does work which falls under the following headings, the company agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • Adverse Weather Conditions Except in emergency situations, the Employer shall not require an employee:

  • General Conditions (i) Each party will make each payment or delivery specified in each Confirmation to be made by it, subject to the other provisions of this Agreement.

  • Unsafe Work Conditions No employee shall be disciplined for refusal to work on an assignment which, in the opinion of:

  • GENERAL WORKING CONDITIONS The District has empowered school communities to make decisions at the school level in return for accountability for results. To maximize the likelihood of success, each school must be permitted to implement programs that meet the needs of its students and community. Through a school-based decision-making process, each school will define the staff working conditions necessary for student success. School leadership teams will create and publish annual “school operational plans” which will outline working conditions of staff in the building. Such operational plans will be subject to the Superintendent’s review and approval.

  • General Conditions Costs Construction Manager is entitled to receive payment for the actual cost of the allowable General Conditions items incurred after receipt of a Notice to Proceed with Construction from the Owner through Substantial Completion of the Project plus thirty (30) calendar days. Construction Manager is not entitled to reimbursement for General Conditions Costs incurred before receipt of the Notice to Proceed. General Conditions Costs incurred after Substantial Completion must be approved in advance by the Owner. Allowable General Conditions items are identified below and by attached exhibit. These items shall be included in the General Conditions cost amount shown as a line item in the Guaranteed Maximum Price Proposal and as detailed on the schedule of values. Items not specifically included below or in the exhibit will not be allowed as a General Condition costs.

  • Unsafe Working Conditions (a) No Employee shall be disciplined for refusal to work on a job which is deemed unsafe by:

  • SUPERIOR CONDITIONS 21.01 All existing benefits, rights, privileges, practices, terms or conditions of employment which may be considered to be superior to those contained herein and which are set out in Appendix 4 are specifically retained by this Agreement unless otherwise agreed by the local parties. The parties agree to remove from Appendix 4 those superior conditions which no longer have application. Where the parties cannot agree on whether a superior condition continues to have application, the issue will be reduced to a grievance and referred to arbitration.

Time is Money Join Law Insider Premium to draft better contracts faster.