Geometric Alternatives Analysis Sample Clauses

Geometric Alternatives Analysis. In conjunction with traffic analysis, Xxxxxxx Xxxxx will prepare preliminary horizontal geometrics for two (2) build alternatives. Of the following four (4) PSR-PDS build alternatives, two (2) will be evaluated and selected for further geometric analysis: • PSR-PDS Alternative 1 – Type L-2 spread diamond interchange with roundabout intersection control • PSR-PDS Alternative 2 – Type L-9 partial cloverleaf interchange with roundabout intersection control • PSR-PDS Alternative 3 – Type L-8 partial northside cloverleaf interchange with roundabout intersection control • PSR-PDS Alternative 4 – Type L-8 partial northside cloverleaf interchange with signal intersection control The two (2) build alternatives will be analyzed for geometric and operational feasibility based upon traffic analysis. CITY will determine based upon the analysis, which two (2) build alternatives will be carried forward into PA/ED phase. Xxxxxxx Xxxxx will assess qualitatively the build alternatives and compare to the project purpose and need in order to define two (2) build alternatives. A matrix comparing two (2) build alternatives, such as geometric design, traffic operations, impacts, design exceptions, environmental impacts, right of way impacts and other variables will be prepared. The comparison will be rated using numeric ratings and low, medium, high ratings for each of the two (2) build alternatives.
AutoNDA by SimpleDocs
Geometric Alternatives Analysis. 1.5 Traffic Analysis and Study 1.6 Selection of Locally Preferred Alternative 1.7 Draft Project Report

Related to Geometric Alternatives Analysis

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp. The origin of the angles of geometric visibility is the perimeter of the projection of the illuminating surface on a transverse plane tangent to the foremost part of the lens of the headlamp.

  • Alternative Warning Xxxxxxx may, but is not required to, use the alternative short-form warning as set forth in this § 2.3(b) (“Alternative Warning”) as follows: WARNING: Cancer and Reproductive Harm - xxx.X00Xxxxxxxx.xx.xxx.

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • Excellent Above Average Satisfactory Needs Improvement Unsatisfactory 5 4 3 2 1 5. The instructor demonstrates knowledge of the subject matter.

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4.

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is an NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram with the exception of the English Language Proficiency Assessments for California (“ELPAC”) to be completed by the LEA, and as appropriate to the student, and mandated by XXX xxxxxxxx to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. XXX shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by XXX.

  • Project Monitoring Reporting Evaluation A. The Project Implementing Entity shall monitor and evaluate the progress of its activities under the Project and prepare Project Reports in accordance with the provisions of Section 5.08(b) of the General Conditions and on the basis of indicators agreed with the Bank. Each such report shall cover the period of one

Time is Money Join Law Insider Premium to draft better contracts faster.