Engineer’s Acceptance Control Sample Clauses

Engineer’s Acceptance Control. The Engineer’s own testing and inspection frequency shall be based on the frequency of process control testing prescribed in SABS1200, and shall be at a frequency of at least 10% of process control testing. This percentage may need to increase if irregularities arise. In the event that the Engineer has received all process control testing for a particular activity, and has performed its own checks and is satisfied that the required standards have been achieved, it shall, prior to approving such work, inform the QMO via an agreed mode of communication, and grant the QMO an opportunity to carry out further testing before work is covered up. Such tests, if any, shall be carried out at the QMO’s discretion. Engineer’s Report Forms (ERF) shall make provision for request for acceptance by the Contractor, indicating that the Contractor has carried out all process control in terms of the Specifications, with all test results and tolerance checks attached to such request. The ERF shall then be completed by the Engineer, and shall include copies of the Engineer’s inspections and tests conducted. The forms vary depending on inspection or test type, and shall include: • Description or title of the inspection activity • Location of the inspection activity or location from which the sample was obtained • Recorded observation or test dataResults of the inspection activity and applicable tests • Personnel involved in the inspection activity • Signature of the Engineer / Resident Engineer Engineer’s Report Forms (ERF) Once completed and signed by the Engineer, the ERF’s shall be filed in the QAM (Volume 2).
AutoNDA by SimpleDocs

Related to Engineer’s Acceptance Control

  • INSPECTION, ACCEPTANCE AND REJECTION a. All Goods will be subject to Mercy Corps' inspection and testing (which may be done by a third party authorized by Mercy Corps), at any time and place, including the period of manufacture/production/creation and before final acceptance. If Mercy Corps inspects or tests at Supplier's premises, Supplier, without additional charge, will provide all reasonable facilities and assistance for the safety and convenience of Mercy Corps' inspectors. No inspection or testing done or not done before final inspection and acceptance will relieve Supplier from responsibility for defects or for other failure to meet the requirements of this Agreement. Notwithstanding any prior inspections or payments made, all Goods will be subject to final inspection and acceptance at the Delivery Location within a reasonable time after delivery (but in no event, less than three days after the date of delivery).

  • Inspection; Acceptance The Contractor (immixTechnology, Inc.) can only, and shall only tender for acceptance those items that substantially conform to the software manufacturer’s (“Dassault Systemes Americas Corp.”) published specifications. Therefore, items delivered shall be considered accepted upon delivery. The Government reserves the right to inspect or test any supplies or services that have been delivered. The Government may require repair or replacement of nonconforming supplies or re-performance of nonconforming services at no increase in contract price. If repair/replacement or re-performance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-

  • BID ACCEPTANCE PERIOD A bid shall constitute an irrevocable offer for a period of ninety (90) days from the bid opening date or until the date of award. In the event that an award is not made by the County within ninety (90) days from the bid opening date, the Bidder may withdraw their bid or provide a written extension of their bid.

  • PRODUCT ACCEPTANCE Unless otherwise provided by mutual agreement of the Authorized User and the Contractor in the Authorized User Agreement, Authorized User(s) shall have sixty (60) days from the date of delivery to accept all Product. Where the Contractor is responsible for installation, acceptance shall be from completion of installation. Title or other property interest and risk of loss shall not pass from Contractor to the Authorized User until the Products have been accepted. Failure to provide notice of acceptance or rejection or a deficiency statement to the Contractor by the end of the period provided for under this clause constitutes acceptance by the Authorized User(s) as of the expiration of that period. The License Term shall be extended by the time periods allowed for trial use, testing and acceptance unless the Commissioner or Authorized User agrees to accept the Product at completion of trial use. Unless otherwise provided by mutual agreement of the Authorized User and the Contractor, Authorized User shall have the option to run testing on the Product prior to acceptance, such tests and data sets to be specified by User. Where using its own data or tests, Authorized User must have the tests or representative set of data available upon delivery. This demonstration will take the form of a documented installation test, capable of observation by the Authorized User, and shall be made part of the Contractor’s standard documentation. The test data shall remain accessible to the Authorized User after completion of the test. In the event that the documented installation test cannot be completed successfully within the specified acceptance period, and the Contractor or Product is responsible for the delay, Authorized User shall have the option to cancel the order in whole or in part, or to extend the testing period for an additional thirty

  • Offer and Acceptance of Weekend Overtime (a) The Employer is committed to providing reasonable notice to Employees of an offer / cancellation of weekend overtime. To this end, notice will generally be provided prior to the normal meal break on Thursday. Where the Employer is unable to give such notice the Employer may offer I cancel such overtime by notifying affected Employees before the finish time of ordinary hours on Friday.

  • CONTRACT ACCEPTANCE By acceptance of this order, Xxxxxx agrees that the scope of the work required is understood by Xxxxxx; that there are no informal commitments by Buyer that in any way affect the work under this order; that there are no open or unresolved issues related to this order except as explicitly stated herein; and that Xxxxxx therefore understands and agrees that this order states the complete agreement of the parties. COST ACCOUNTING STANDARDS (CAS) CAS requirements do not apply if the order does not exceed $650,000 or if the Seller claims an exemption per the Proposal Representation and Certification, or if certified cost or pricing data was not provided.

  • 361 Acceptance of Specified Roads Specified Road work may be accepted subject to completion of clearing work that does not affect the road structure when completion is delayed for reasons beyond control of Purchaser, such as adverse weather. Specified Road work may be accepted subject to completion of planting and seeding for soil stabilization when completion is delayed for reasons beyond control of Purchaser, such as seasonal limitations. Purchaser shall complete planting or seeding on such road during the next suitable planting season. Specified Road work may be conditionally accepted prior to the application of dust palliatives when application is not necessary to prevent dusting of the road surface due to climatic conditions. Purchaser shall apply dust palliative on such roads prior to use during periods when dusting may occur. Prior to request for final inspection, Specified Road work, roadways, borrow pits, and quarries, occupied and no longer needed by Purchaser in connection with Purchaser’s Operations, shall be cleared of all rubbish, excess materials, and temporary structures.

  • Required Acceptance of Daily Load Deliveries and Notification If the State is harmed by purchaser’s refusal to accept up to 10 truck deliveries of any one sort per day, Purchaser will be in breach of contract and subject to damages as per the D-026.2 and D-027.2 clauses. A truck delivery is all the wood delivered including sorts on super trucks, mule trains and pups brought to the delivery point by a single truck. The Purchaser shall notify the Contract Administrator at least 48 hours in advance if:

  • Agreement Acceptance This Agreement is subject to acceptance by signature, issuance of an appropriate purchase order, and approval of the Agreement by the Board of Education.

  • ACCEPTANCE TESTS 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract.

Time is Money Join Law Insider Premium to draft better contracts faster.