Volume 2 definition

Volume 2 means that portion of a SOQ prepared in accordance with the Volume 2 Requirements.
Volume 2 means Volume 2 of the ITN documentation;
Volume 2 means the project-specific technical provisions entitled “Technical Provisions for DB Agreement - Volume 2”.

Examples of Volume 2 in a sentence

  • The controls contemplated in this Article are in addition to, and are not intended to change or supersede, the provisions of the International Traffic in Arms Regulations (22 C.F.R. Part 120, et seq.), DoD Manual 5220.22, Volume 2 (August 1, 2018), and the Department of Commerce’s Export Administration Regulations (15 C.F.R. Part 730, et seq.).

  • The execution of a machine capability study and a process capability study are governed by VDA Volume 2, VDA Volume 4 and AIAG Document SPC, and they must be carried out accordingly.

  • Spark Arrester Guide – Multiposition Small Engine (MSE), Volume 2, August 2012, 1251 1808- SDTDC as revised and updated.

  • In addition, the supplier shall provide the voestalpine material number and relevant information on the product history in accordance with VDA Volume 2 as part of the initial sampling on the supplier’s own initiative, unless otherwise agreed with voestalpine.The sequential numbering used to identify the characteristics in the initial sample test report must be the same as those in the stamped drawing.

  • Include a similar list for all projects included in the response to Part B, Volume 2, Section B, 1), regardless of whether the dispute occurred during the past five years or involved the same organization that is on the Proposer’s team.

  • Project Requirements are defined as guidelines or specifications approved in writing by the Minister including but not limited, to “Engineering Consultant Guidelines for Highway, Bridge and Water Projects, Volume 1 - Design and Tender”, and “Engineering Consultant Guidelines for Highway, Bridge and Water Projects, Volume 2 - Construction Contract Administration”.

  • For any entity identified in the QS for which experience and qualifications have not been provided pursuant to Part B, Volume 2, Section B, 1)(a), the Proposer may, but is not required to, include the relevant project reference on Form E.

  • Production process and product approval shall be effectuated either in accordance with VDA Volume 2 Submission Level 2 (PPA), in accordance with the production parts acceptance procedure of AIAG PPAP Submission Level 3 and/or in accordance with the customer’s requirements.

  • The extent to which the Lead Operations and Maintenance Firm satisfies or exceeds the requirements (as evidenced in submission of completed Forms D-3 and E; and Part B, Volume 2, Section B, 1) (b)) for relevant technical capability as follows: roadway operations and maintenance experience on similar roadways.

  • An express, written statement committing that the Key Personnel designated in the QS for the positions or roles described this Part B, Volume 2, Section B, 2)(a) shall be available to serve the role so identified in connection with the Project.