Development length Sample Clauses

Development length. (Ld) for strength steel deformed bars shall be 41 times dia of bar for M-25 grade concrete.
AutoNDA by SimpleDocs

Related to Development length

  • Development and Commercialization Subject to Sections 4.6 and 4.7, Fibrocell shall be solely responsible for the development and Commercialization of Fibrocell Products and Improved Products. Fibrocell shall be responsible for all costs incurred in connection with the Fibroblast Program except that Intrexon shall be responsible for the following: (a) costs of establishing manufacturing capabilities and facilities in connection with Intrexon’s manufacturing obligation under Section 4.6 (provided, however, that Intrexon may include an allocable portion of such costs, through depreciation and amortization, when calculating the Fully Loaded Cost of manufacturing a Fibrocell Product, to the extent such allocation, depreciation, and amortization is permitted by US GAAP, it being recognized that the majority of non-facilities scale-up costs cannot be capitalized and amortized under US GAAP); (b) costs of basic research with respect to the Intrexon Channel Technology and Intrexon Materials (i.e., platform improvements) but, for clarity, excluding research described in Section 4.7 or research requested by the JSC for the development of a Fibrocell Product or an Improved Product (which research costs shall be reimbursed by Fibrocell); (c) [*****]; and (d) costs of filing, prosecution and maintenance of Intrexon Patents. The costs encompassed within subsection (a) above shall include the scale-up of Intrexon Materials and related active pharmaceutical ingredients for clinical trials and Commercialization of Fibrocell Products undertaken pursuant to Section 4.6, which shall be at Intrexon’s cost whether it elects to conduct such efforts internally or through Third Party contractors retained by either Intrexon or Fibrocell (with Intrexon’s consent).

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • Development Diligence Novartis shall dedicate commercially reasonable efforts, during each [**] month period, necessary to continue the advancement of Licensed Compounds and Licensed Products with respect to at least one Profile towards the next clinical Development milestone or approval milestone, as described in Sections 7.4.2 or 7.4.3, respectively. If Novartis (itself or through its Affiliates or sublicensees) fails to dedicate commercially reasonable efforts, during any [**] month period, necessary to continue the advancement of Licensed Compounds and Licensed Products with respect to at least one Profile towards such next milestone, then any dispute regarding Novartis’ failure of development diligence with respect to such Profile shall be resolved in accordance with Article 13.

  • Collaboration We believe joint effort toward common goals achieves trust and produces greater impact for L.A. County’s youngest children and their families.

  • Development Agreement As soon as reasonably practicable following the ISO’s selection of a transmission Generator Deactivation Solution, the ISO shall tender to the Developer that proposed the selected transmission Generator Deactivation Solution a draft Development Agreement, with draft appendices completed by the ISO to the extent practicable, for review and completion by the Developer. The draft Development Agreement shall be in the form of the ISO’s Commission-approved Development Agreement for its reliability planning process, which is in Appendix C in Section 31.7 of Attachment Y of the ISO OATT, as amended by the ISO to reflect the Generator Deactivation Process. The ISO and the Developer shall finalize the Development Agreement and appendices as soon as reasonably practicable after the ISO’s tendering of the draft Development Agreement. For purposes of finalizing the Development Agreement, the ISO and Developer shall develop the description and dates for the milestones necessary to develop and construct the selected project by the required in-service date identified in the Generator Deactivation Assessment, including the milestones for obtaining all necessary authorizations. Any milestone that requires action by a Connecting Transmission Owner or Affected System Operator identified pursuant to Attachment P of the ISO OATT to complete must be included as an Advisory Milestone, as that term is defined in the Development Agreement. If the ISO or the Developer determines that negotiations are at an impasse, the ISO may file the Development Agreement in unexecuted form with the Commission on its own, or following the Developer’s request in writing that the agreement be filed unexecuted. If the Development Agreement is executed by both parties, the ISO shall file the agreement with the Commission for its acceptance within ten (10) Business Days after the execution of the Development Agreement by both parties. If the Developer requests that the Development Agreement be filed unexecuted, the ISO shall file the agreement at the Commission within ten (10) Business Days of receipt of the request from the Developer. The ISO will draft, to the extent practicable, the portions of the Development Agreement and appendices that are in dispute and will provide an explanation to the Commission of any matters as to which the parties disagree. The Developer will provide in a separate filing any comments that it has on the unexecuted agreement, including any alternative positions it may have with respect to the disputed provisions. Upon the ISO’s and the Developer’s execution of the Development Agreement or the ISO’s filing of an unexecuted Development Agreement with the Commission, the ISO and the Developer shall perform their respective obligations in accordance with the terms of the Development Agreement that are not in dispute, subject to modification by the Commission. The Connecting Transmission Owner(s) and Affected System Operator(s) that are identified in Attachment P of the ISO OATT in connection with the selected transmission Generator Deactivation Solution shall act in good faith in timely performing their obligations that are required for the Developer to satisfy its obligations under the Development Agreement.

  • Research Plan The Parties recognize that the Research Plan describes the collaborative research and development activities they will undertake and that interim research goals set forth in the Research Plan are good faith guidelines. Should events occur that require modification of these goals, then by mutual agreement the Parties can modify them through an amendment, according to Paragraph 13.6.

  • Development Period The Contractor may commence pre-construction activities like utility shifting, boundary wall construction or any other activity assigned to the Contractor by the Authority to enable construction of the Project Highway immediately after signing of the Agreement, to the extent that such work is ready for execution. The Parties agree that these works may be taken up and completed to the extent feasible by the Contractor, before declaration of the Appointed Date, but no claim against the Authority for delay shall survive during this period and that the undertaking of these works by the Contractor shall not count towards the Scheduled Construction Period of the project which starts counting only from the Appointed Date. No construction activity of the Project Highway shall be undertaken during the development period.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Development Program A. Development activities to be undertaken (Please break activities into subunits with the date of completion of major milestones)

  • Commercialization Intrexon shall have the right to develop and Commercialize the Reverted Products itself or with one or more Third Parties, and shall have the right, without obligation to Fibrocell, to take any such actions in connection with such activities as Intrexon (or its designee), at its discretion, deems appropriate.

Time is Money Join Law Insider Premium to draft better contracts faster.