Common use of Design Phase Clause in Contracts

Design Phase. The design phase of the project shall consist of the preparation of completely approved construction documents that reflect the approved Preliminary Engineering Report. It also includes coordination with other design consultants on adjacent segments, and potentially restriping the pavement between Segment 1 and Segment 2. The design consultants of both segments will evaluate and coordinate how to best handle the transition and/or striping. The Design shall build upon the framework identified in the Preliminary Engineering Report and include roadway design, profiles, drainage system and appurtenances, details and the bid documents necessary for a complete design review. The submittal shall be considered final and ready for construction, barring minor comments from Fort Bend County. The Design Submittal shall address all comments from the Preliminary Engineering Phase of the project. The Design Submittal shall include the submittal of the construction ready plans on 11”x17”, the project manual, final utility conflict table, and a final cost estimate in accordance with FBCED requirements. The design submittal includes the following milestones:  70% Submittal (1st Submittal): The submittal shall consist of: o Address 30% Comments o Coversheet o Index of Sheets o Existing and Proposed Typical Sections o Project Layout Sheet o Survey Control Map o Right of Way Map o Horizontal Alignment Data o Plan and Profile o Drainage Area Map o Hydraulic Calculations o Detention Plan o Traffic Control Plan o Traffic Signals & Details (if needed) o Storm Water Pollution Prevention Plan o Cross Sections o Standard Details o Specifications Table of Contents o Spreadsheet based Bid Form with Estimated Unit and Total Costs o 70% Plans on 11”x17” Sheets with Electronic PDF files, and KMZ file of existing conditions and current design o Submit drawings for regulatory permit and utility reviews o 70% Review Checklist  95% Submittal (2nd Submittal): The submittal shall consist of all the 70% requirements plus the following: o Address 70% Comments & Comment Resolution Spreadsheet o Bid Ready (Not Sealed) o General Notes o Signage and Pavement Marking Plans o Project Manual with Bid Form, Specification Table of Contents, Special Specifications or Conditions, and Contract Documents Excluded o 95% Plans on 11”x17” Sheets with Electronic PDF files, and KMZ file of existing conditions and current design o 95% Review Checklist

Appears in 2 contracts

Samples: Agreement, Agreement for Professional Engineering Services

AutoNDA by SimpleDocs

Design Phase. Developing a Commissioning Plan (to be updated throughout the project; all bid packages/phases to be included in a single plan document) • Developing and Updating the Commissioning Specifications for incorporation into the project • Developing procedures for an issues log to track all commissioning related issues, deficiencies, and resolutions CONSTRUCTION AND POST-CONSTRUCTION PHASE: • Planning and conducting a Commissioning Kickoff Meeting at the project site with all contractors, for each site • Updating the Commissioning Plan • Reviewing Submittals for the equipment that is within the scope of commissioning scope – this will consist of an initial review and one (1) backcheck • Updating and finalizing the Pre-Functional Checklists and Functional Performance Tests • The Checklists and Test scripts will initially be developed during the Design Phase, but will need to be updated during the Construction Phase to incorporate information from submittals as well as design phase changes • Reviewing completed Start-Up Reports • Reviewing completed Pre-Functional Checklists • Reviewing the Test and Balance Report(s) • Conducting up to ten (10) Site Visits during the Construction Phase  The Site Visits will be conducted to remain updated on the construction progress, spot check the completion of Pre-Functional Checklists, answer commissioning related questions directly in the field, and identify potential issues/concerns before Functional Performance Testing • Conducting Functional Performance Testing • Reviewing O&M Manuals • Developing a Final Commissioning Report • Participate in bi-weekly OAC meetings through heavy construction / commissinoing activity phases (20 meetings assumed) We exclude work that is documented in the specifications as being completed by others, including the General Contractor, Mechanical Contractor, Electrical Contractor, Testing and Balancing Contractor, Construction Manager, Design Architect, Engineer, and Owner. We appreciate the opportunity to work with you and anticipate a successful project. If there is any further information we may provide, please contact me. Sincerely, Xxxxxxx Xxxxxxxx, PE Xxxx Xxxxxxx, PE Project Manager Principal 512.744.4453 direct 512.744.4414 direct xxxxxxxxxxxxxxx@xxxxx.xxx xxxxxxxxxxx@xxxxx.xxx cc: Attachments ATTACHMENT “A” Standard Hourly Rates FEBRUARY 2022 President / Chairman of the project shall consist Board $290 Officer $265 Principal $215 Associate Principal $200 Branch Manager/Director $200 Senior Project Manager/Engineer $190 Project Manager/Engineer $175 Engineer in Training / Graduate Engineer / BIM Manager $140 Senior Designer $125 Designer / Commissioning Technician $105 Marketing Manager $105 Junior Designer $90 Administrative Staff $70 DocuSign Envelope ID: E831F024-8A6C-4635-9353-E92BDDF1FDB1 TFC Contract 00-000-000 Energy Engineering Associates, Inc. EXHIBIT H APPROVED HUB SUBCONTRACTING PLAN Page 1 of 2 Texas Facilities Commission (TFC) - HUB Program EVALUATION OF RESPONDENT’S HUB SUBCONTRACTING PLAN (HSP) Instructions: This evaluation must be completed for each response before it can be considered further. Please complete a separate evaluation sheet for each response within five (5) business days after the opening date of the preparation solicitation. Section I: Name of completely approved construction documents Respondent: EEA Consulting Engineers Name of Project: ReCommissioning MEP DM Mutple Stat Bldgs Contract # Req #: 000-0-00000 PO #: PROJECT/WO #: RFQ #: RFP #: IFB #: SERVICES ■ AE: CMR RC IDIQ Assignment #: Amendment #: GMP#: POCN#: TFC HUB Coordinator has reviewed the above referenced HSP response to this solicitation and finds that reflect the approved Preliminary Engineering Report. It also includes coordination HSP: ■ complies with other design consultants on adjacent segments, and potentially restriping does not comply with Method Used to Achieving HUB Compliance: HSP – Meet the pavement between Segment 1 and Segment 2. The design consultants of both segments will evaluate and coordinate how Goal Professional Services – Respondent has met the 23.7 % Meet the Goal with HUB Participation (per TAC Rules 20.285(d)(1)(D)(iii)) Print/Type Name: TFC HUB Coordinator/Date: Burks_S Digitally signed by Burks_SDate: 2021.06.30 16:07:24 -05'00' Section II: Does the respondent intend to best handle the transition and/or striping. The Design shall build upon the framework identified in the Preliminary Engineering Report and include roadway design, profiles, drainage system and appurtenances, details and the bid documents necessary for a complete design review. The submittal shall be considered final and ready for construction, barring minor comments from Fort Bend County. The Design Submittal shall address all comments from the Preliminary Engineering Phase of the project. The Design Submittal shall include the submittal of the construction ready plans on 11”x17”, the project manual, final utility conflict table, and a final cost estimate in accordance with FBCED requirements. The design submittal includes subcontract? ■ YES NO N/A Instructions: If “Yes,” do not proceed to the following milestones:  70% Submittal (1st Submittal): The submittal shall consist of: o Address 30% Comments o Coversheet o Index of Sheets o Existing and Proposed Typical Sections o Project Layout Sheet o Survey Control Map o Right of Way Map o Horizontal Alignment Data o Plan and Profile o Drainage Area Map o Hydraulic Calculations o Detention Plan o Traffic Control Plan o Traffic Signals & Details (if needed) o Storm Water Pollution Prevention Plan o Cross Sections o Standard Details o Specifications Table of Contents o Spreadsheet based Bid Form with Estimated Unit and Total Costs o 70% Plans on 11”x17questions. If “No,Sheets with Electronic PDF files, and KMZ file of existing conditions and current design o Submit drawings for regulatory permit and utility reviews o 70% Review Checklist  95% Submittal (2nd Submittal): The submittal shall consist of all proceed to the 70% requirements plus the following: o Address 70% Comments & Comment Resolution Spreadsheet o Bid Ready (Not Sealed) o General Notes o Signage and Pavement Marking Plans o Project Manual with Bid Form, Specification Table of Contents, Special Specifications or Conditions, and Contract Documents Excluded o 95% Plans on 11”x17” Sheets with Electronic PDF files, and KMZ file of existing conditions and current design o 95% Review Checklistnext question. Comments:

Appears in 1 contract

Samples: Architect/Engineer Agreement

AutoNDA by SimpleDocs

Design Phase. Scope of Services: The engineering design phase of the project shall consist of the preparation of completely approved construction documents that reflect the approved Preliminary Engineering Report. It also includes coordination with other design consultants on adjacent segments, and potentially restriping the pavement between Segment 1 and Segment 2. The design consultants of both segments will evaluate and coordinate how to best handle the transition and/or striping. The Design shall build upon the framework identified in the Preliminary Engineering Report and include roadway design, profiles, drainage system and appurtenances, details and the bid documents necessary for a complete design review. The submittal shall be considered final and ready for construction, barring minor comments from Fort Bend County. The Design Submittal shall address all comments from the Preliminary Engineering Phase of the project. The Design Submittal shall include the submittal of the construction ready plans on 11”x17”, the project manual, final utility conflict table, and a final cost estimate performed in accordance with FBCED generally accepted procedures, approved variances, FBC and TxDOT design guidelines, standards and specifications. Work specific to the location is described below: The T intersection of US 90A at Gateway Boulevard shall receive a new conventional signal system with ground-mounted controller, cabinet and BBUs. The new signal system shall be fully actuated with a) radar detection for vehicles on asphalt pavement, and b) loop detection system for vehicles on concrete pavement based on TxDOT requirements. At the direction of FBC, no pedestrian signals, related appurtenances, ramps/landings, or crosswalks shall be provided at this time. The new signal shall have single and/or dual mast arm galvanized steel pole configuration (mounted in the median area of US 90A) with horizontal LED vehicle signal heads. Westbound left turn signal will have protected/permissive phasing with flashing yellow indications. The intersection will receive two (2) pole-mounted LED luminaires for safety lighting. The eastbound U-turn area will be reconstructed to remove the raised median between the U- turn and the intersection opening. Turn-lane storages will be reviewed (based on traffic data/traffic study to be provided by FBC), and storage extensions will be recommended, if necessary. Overhead power lines currently exist at the intersection along the south side of US 90A, and it appears the signal system won’t be impacted by these power lines. Coordination with CenterPoint Xxxxx Xxxxxxxxx, PE, PTOE US 90A at Gateway Boulevard Page 2 Energy will be done by EPIC and Power Service Outlet and Data Statement will be obtained and submitted. Coordination with Home Owners Association will be done for any irrigation, plants, controller location and utility easements, if required. Plan layouts shall be prepared in English units at 1”=40’ scale on 11”x17” layouts. Interim reviews shall be at the 70%, 95% and 100% submittals. For which, one set of bond layouts and one PDF copy shall be submitted as requested by FBC. The final submittal will be the sealed and signed bond set of plans. All design submittal includes drawings shall be prepared using Microstation V8i graphics software and shall be consistent with the level structure required by FBC. Basis of estimate will be provided in FBC format. Computer files containing all design drawings required for the Project shall be provided. Plan layouts shall be prepared per FBC and TxDOT Signal Design Guidelines and shall be designed as part of a standalone bid package. Following are the anticipated sheets: • Cover Sheet & Index • Construction Notes and Traffic Signal Notes • Basis of Estimate • Existing Conditions Layout • Proposed Signal Layouts • Proposed Roadway Improvements Layout • Proposed Signing & Pavement Markings Layout • Standard Detail Drawings (as required) Exclusions: The following milestonesservices are not part of the scope:  70% Submittal (1st Submittal): The submittal shall consist of: o Address 30% Comments o Coversheet o Index of Sheets o Existing and Proposed Typical Sections o Project  Geotechnical Engineering  Drainage Design  Interconnect Layout Sheet o Survey Control Map o Right of Way Map o Horizontal Alignment Data o Plan and Profile o Drainage Area Map o Hydraulic Calculations o Detention Plan o  Site-specific Traffic Control Plan o Traffic Signals & Details (if needed) o Plans  Storm Water Pollution Prevention Plan o Cross Sections o Standard Details o Specifications Table Plans (SWPPP)  Expert Testimony  Record drawings  Traffic signal timing adjustment  Design changes outside scope of Contents o Spreadsheet based Bid Form with Estimated Unit and Total Costs o 70% Plans services Survey: Survey limits are 500 feet on 11”x17” Sheets with Electronic PDF fileseach leg of US 90A, and KMZ file of existing conditions 300 feet on Gateway Boulevard. See attached survey proposal for details regarding topographic survey and current design o Submit drawings for regulatory permit and utility reviews o 70% Review Checklist  95% Submittal (2nd Submittal): The submittal shall consist of all the 70% requirements plus the following: o Address 70% Comments & Comment Resolution Spreadsheet o Bid Ready (Not Sealed) o General Notes o Signage and Pavement Marking Plans o Project Manual with Bid Form, Specification Table of Contents, Special Specifications or Conditions, and Contract Documents Excluded o 95% Plans on 11”x17” Sheets with Electronic PDF files, and KMZ file of existing conditions and current design o 95% Review Checklistconstruction staking.

Appears in 1 contract

Samples: Agreement