DESIGN-BUILD FIRM's Project Records Sample Clauses

DESIGN-BUILD FIRM's Project Records. The DESIGN-BUILD FIRM's Project Records shall be maintained as prescribed hereinabove for the minimum period required by Federal Law, and shall be made available to the OWNER or his authorized representative at mutually convenient times. Any records relating to claims, directly or indirectly, shall be provided within 15 days of written request to Owner or its agent.
AutoNDA by SimpleDocs

Related to DESIGN-BUILD FIRM's Project Records

  • Project Records ‌ As further described below, Project records include but are not limited to Grantee, financial, and voucher records. All Project records must be retained for a period of three (3) years after final payment under this Grant. All Project records are subject to audit pursuant to Section P of this Grant Agreement. Upon completion of the third year of record retention, the Grantee shall submit all Project records to CARB. Hardcopy of electronic records are suitable. Acceptable forms of electronic media include hard drives, CDs, DVDs, and flash drives. Other forms of electronic media may be allowed based on prior written concurrence from CARB.

  • Design-Builder The person or entity responsible for the proper completion of the activities described in the Contract Documents and who executes the Contract.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

  • Final Project Report Prepare a Final Project Report that addresses, to the extent feasible, comments made by the Grant Manager on the Draft Final Project Report. Submit one (1) reproducible master and an electronic copy of the final. Upload an electronic copy of the final report in pdf format to the FAAST system.

  • Project Review A. Programmatic Allowances

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Project Engineer If the Project has been designed by the Project Engineer, the Project Engineer is to act as the Owner's representative, assumes all duties and responsibilities, and has the rights and authority assigned to Project Engineer in the Contract Documents in connection with completion of the Work all in accordance with the Contract Documents.