DAMAGE TO EXISTING STREETS, DRAINAGE STRUCTURES OR OTHER FACILITIES Sample Clauses

DAMAGE TO EXISTING STREETS, DRAINAGE STRUCTURES OR OTHER FACILITIES. In the event any existing Township streets, drainage structures or other facilities are disturbed, subjected to excessive wear and tear, damaged or destroyed during the course of the development of the Tract, including but not limited to damages resulting from openings into streets to install underground facilities or resulting from travel or use by vehicles or construction equipment, Developer agrees, at its cost, to repair or, if necessary, replace such facilities. Developer shall be responsible for all damage to the sanitary sewer system or public water system of the Authority which results from Developer's construction or development of the Tract and shall immediately repair all such damage.
AutoNDA by SimpleDocs
DAMAGE TO EXISTING STREETS, DRAINAGE STRUCTURES OR OTHER FACILITIES. In the event any existing Township streets, drainage structures or other facilities are disturbed, subjected to excessive wear and tear, damaged or destroyed during the course of the development of the Tract, including but not limited to damages resulting from openings into streets to install underground facilities or resulting from travel or use by vehicles or construction equipment, Developer agrees, at its cost, to repair or, if necessary, replace such facilities to the Township’s satisfaction.

Related to DAMAGE TO EXISTING STREETS, DRAINAGE STRUCTURES OR OTHER FACILITIES

  • DAMAGE TO FACILITIES The Student will promptly report damages and request necessary repairs, in accordance with established and published procedures. The Student is responsible for damages caused by the Student. Damages to shared or common areas not attributable to a responsible person are the joint responsibility of all persons sharing the space or area. UCF DHRL reserves the right to charge the Student for damages caused by the Student. Charges may include, but are not limited to, extraordinary pest control charges, repair of walls, furniture or fixtures, and damages to common areas. UCF DHRL also reserves the right to charge the Student for a portion of damages caused to spaces shared by the Student when the person responsible for damages to shared spaces cannot be identified.

  • DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Toilet Facilities The Employer provides the Contractor access to toilet facilities. Temporary chemical toilets are provided by the Contractor where deemed necessary.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Subloop Elements 2.8.1 Where facilities permit, BellSouth shall offer access to its Unbundled Subloop (USL) elements as specified herein.

Time is Money Join Law Insider Premium to draft better contracts faster.