Control System Design Criteria Sample Clauses

Control System Design Criteria. The title V permit includes terms requiring the future installation of the control system (a total enclosure and thermal oxidizer) to meet certain minimum design criteria. To assure compliance with applicable requirements, the emissions from the new production equipment will have to be captured in a total enclosure (requirements for a total enclosure are specified in the permit) and the oxidizer receiving the emissions from the enclosure will have to be designed to achieve a temperature at the exit of the combustion chamber of at least 1500 F and a residence time of gases in the combustion chamber of at least 0.5 seconds. Additionally, the thermal oxidizer manufacturer selected must guarantee 95 percent or greater destruction of VOC (including VOHAP- volatile organic hazardous air pollutant) at those conditions. If the oxidizer manufacturer's guarantee would only apply at more rigorous combustion conditions (i.e., higher combustion chamber temperature and/or longer residence time), then the manufacturer's minimum combustion conditions associated with the 95 percent VOC destruction efficiency guarantee become the minimum design criteria;
AutoNDA by SimpleDocs

Related to Control System Design Criteria

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • CONTROL SYSTEM (a) SELLER shall provide and maintain a quality control system to an industry recognized Quality Standard and in compliance with any other specific quality requirements identified in this Contract.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • System Access Control Data processing systems used to provide the Cloud Service must be prevented from being used without authorization. Measures: • Multiple authorization levels are used when granting access to sensitive systems, including those storing and processing Personal Data. Authorizations are managed via defined processes according to the SAP Security Policy • All personnel access SAP’s systems with a unique identifier (user ID). • SAP has procedures in place so that requested authorization changes are implemented only in accordance with the SAP Security Policy (for example, no rights are granted without authorization). In case personnel leaves the company, their access rights are revoked. • SAP has established a password policy that prohibits the sharing of passwords, governs responses to password disclosure, and requires passwords to be changed on a regular basis and default passwords to be altered. Personalized user IDs are assigned for authentication. All passwords must fulfill defined minimum requirements and are stored in encrypted form. In the case of domain passwords, the system forces a password change every six months in compliance with the requirements for complex passwords. Each computer has a password-protected screensaver. • The company network is protected from the public network by firewalls. • SAP uses up–to-date antivirus software at access points to the company network (for e-mail accounts), as well as on all file servers and all workstations. • Security patch management is implemented to provide regular and periodic deployment of relevant security updates. Full remote access to SAP’s corporate network and critical infrastructure is protected by strong authentication.

  • Drug Testing Procedures a. The testing procedures and safeguards provided in this policy shall be adhered to by any laboratory personnel administering departmental drug tests.

Time is Money Join Law Insider Premium to draft better contracts faster.