Building Systems Commissioning Sample Clauses

Building Systems Commissioning. Each tenant must hire a commissioning authority with documented commissioning experience on at least two other building projects. The commissioning authority will verify and ensure that mechanical, electrical and all other energy using systems are installed and calibrated to operate according to the Owner Project Requirements (“OPR”) and Basis of Design (“BOD”). To fulfill the intent of this requirement:
AutoNDA by SimpleDocs
Building Systems Commissioning. Services The following building systems are to be commissioned in accordance with ASHRAE Guideline 0, and the ACG Commissioning Guideline. All building systems are to be commissioned at 100% unless otherwise noted:
Building Systems Commissioning i. Landlord, with the assistance of the Commissioning Agent, shall comply with the following:
Building Systems Commissioning. The Tenant agrees to provide basic Commissioning for any tenant-provided building systems, including basis of design, specifications, plans, verification, control sequencing, operations, and maintenance manuals, reports, and training for maintenance staff.

Related to Building Systems Commissioning

  • Building Systems The term “Building Systems” means all systems serving the Building in general, including, but not limited to, the fire/life safety, electrical, plumbing, HVAC, including all components thereof and related equipment, but excluding any equipment that is separately installed by or on behalf of Tenant and any distribution systems or equipment existing within the Premises.

  • Building Services Labor Law Article 9 applies to Contracts for building service work over $1,500 with a public agency, that: (i) involve the care or maintenance of an existing building, or (ii) involve the transportation of office furniture or equipment to or from such building, or (iii) involve the transportation and delivery of fossil fuel to such building, and (iv) the principal purpose of which is to furnish services through use of building service employees.

  • Installation Services 3.1 The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Premises Building Project and Common Areas 1.1 Premises, Building, Project and Common Areas.

  • Utility Services Company agrees to pay the full cost and expense associated with its use of all utilities, including but not limited to water, sanitary sewer, electric, storm drainage, and telecommunication services.

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR Other services: 130 thousand SDR List of Entities which procure the services, specified in Annex 4:

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Office Space and Facilities The Adviser will arrange to furnish the Trust office space in the offices of the Adviser, or in such other place or places as may be agreed upon from time to time, and all necessary office facilities, simple business equipment, supplies, utilities and telephone service required for managing the investments of the Trust.

  • Meeting Space and Facilities The Employer’s offices and facilities may be used by the Union to hold meetings, subject to the agency’s policy, availability of the space and with prior authorization of the Employer.

  • Commissioning Commissioning tests of the Interconnection Member’s installed equipment shall be performed pursuant to applicable codes and standards. The Cooperative must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.