Approved Regulated Revenue Modifications Sample Clauses

Approved Regulated Revenue Modifications. The Hospital may request a reevaluation of its Approved Regulated Revenue for any Rate Year by submitting its request in writing to the HSCRC staff and including the supporting rationale and documentation for its request to the HSCRC staff. The HSCRC staff will make a determination to approve, modify, or deny the request of the Hospital under this agreement. When it deems necessary, the staff will prepare a recommendation regarding the request, and the HSCRC will review the staff recommendation and render a decision. Similarly, the HSCRC may open discussions with the Hospital regarding modifications to the GBR constraint based on its ongoing review and monitoring of the Hospital’s operations, performance, market share changes and other factors. The HSCRC staff reserves the right to modify the GBR constraint in accordance with the terms of this agreement.
AutoNDA by SimpleDocs

Related to Approved Regulated Revenue Modifications

  • OGS Centralized Contract Modifications OGS, an Authorized User, or the Contractor may suggest modifications to the Centralized Contract or its Appendices. Except as specifically provided herein, modifications to the terms and conditions set forth herein may only be made with mutual written agreement of the Parties. Modifications may take the form of an update or an amendment. “

  • CENTRALIZED CONTRACT MODIFICATIONS A. OGS, an Authorized User, or the Contractor may suggest modifications to the Centralized Contract or its Appendices. Except as specifically provided herein, modifications to the terms and conditions set forth herein may only be made with mutual written agreement of the Parties. Modifications may take the form of an update or an amendment. “

  • Cost Modifications The parties may agree to a reduction in the cost of the Contract at any time during which the Contract is in effect. Without intending to impose a limitation on the nature of the reduction, the reduction may be to hourly, staffing or unit costs, the total cost of the Contract or the reduction may take such other form as the State deems to be necessary or appropriate.

  • Initial Forecasts/Trunking Requirements Because Verizon’s trunking requirements will, at least during an initial period, be dependent on the Customer segments and service segments within Customer segments to whom CSTC decides to market its services, Verizon will be largely dependent on CSTC to provide accurate trunk forecasts for both inbound (from Verizon) and outbound (to Verizon) traffic. Verizon will, as an initial matter, provide the same number of trunks to terminate Reciprocal Compensation Traffic to CSTC as CSTC provides to terminate Reciprocal Compensation Traffic to Verizon. At Verizon’s discretion, when CSTC expressly identifies particular situations that are expected to produce traffic that is substantially skewed in either the inbound or outbound direction, Verizon will provide the number of trunks CSTC suggests; provided, however, that in all cases Verizon’s provision of the forecasted number of trunks to CSTC is conditioned on the following: that such forecast is based on reasonable engineering criteria, there are no capacity constraints, and CSTC’s previous forecasts have proven to be reliable and accurate.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Acceptable Modifications 8. This Guaranty shall be binding upon the Guarantor and upon its successors and assigns and shall inure to the benefit of and be enforceable by the Guaranteed Party and their successors and assigns; provided, however, that the Guarantor may not assign or transfer any of its rights or obligations hereunder without the prior written consent of the Guaranteed Party, which consent may not be unreasonably withheld or delayed. The assignment rights of the Guaranteed Party will be in accordance with any applicable terms of the Agreement. Modification #7

  • Budget Modifications The total Approved Budget and the assignment of costs may be adjusted based on implementation of the Scope of Work, spending patterns, and unexpended funds, but only by an amendment to the Approved Budget. In no event shall an amendment to the Approved Budget result in payments in excess of the aggregate amount specified in Section 2.01 “Award of Monies” or in approved supplemental funding for the Project, if any. The RECIPIENT may make transfers between or among lines within budget categories without prior written approval provided that:

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.