Ambulance Staffing Requirements Sample Clauses

Ambulance Staffing Requirements. A. All ambulances rendering services under this Agreement shall be staffed and equipped to render ALS level care and transport until such time MVEMSA has approved a tiered response to provide for a BLS ambulance..
AutoNDA by SimpleDocs
Ambulance Staffing Requirements i. All Ambulances rendering 911 Emergency Ambulance Services under the Agreement shall be staffed and equipped to render paramedic-level care and transport with a minimum of two state licensed and locally certified Paramedics.
Ambulance Staffing Requirements. City shall staff Ambulance personnel as specified in Alameda County EMS Policies.
Ambulance Staffing Requirements. All Ambulances rendering 911 Emergency Ambulance Services under the Agreement shall be equipped to render ALS level care and transport.

Related to Ambulance Staffing Requirements

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.

  • Training Requirements Grantee shall:

  • Credentialing Requirements Registry Operator, through the facilitation of the CZDA Provider, will request each user to provide it with information sufficient to correctly identify and locate the user. Such user information will include, without limitation, company name, contact name, address, telephone number, facsimile number, email address and IP address.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Forecasting Requirements 19.5.1 The Parties shall exchange technical descriptions and forecasts of their Interconnection and traffic requirements in sufficient detail necessary to establish the Interconnections necessary for traffic completion to and from all Customers in their respective designated service areas.

  • Monitoring Requirements This Schedule sets out the contract management requirements which are applicable to the delivery of the Services.

  • Staffing Consultant will designate in writing to Authority its representative, and the manner in which it will provide staff support for the project, which must be approved by Authority. Consultant must notify Authority’s Contract Representative of any change in personnel assigned to perform work under this Contract, and the Authority’s Contract Representative has the right to reject the person or persons assigned to fill the position or positions. The Authority’s Contract Representative shall also have the right to require the removal of the Consultant’s previously assigned personnel, including Consultant’s representative, provided sufficient cause for such removal exists. The criteria for requesting removal of an individual will be based on, but not limited to, the following: technical incompetence, inability to meet the position’s qualifications, failure to perform, poor attendance, ethics violation, unsafe work habits, or damage to Authority or other property. Upon notice for removal, Consultant shall replace such personnel with personnel substantially equal in ability and qualifications for the positions and shall submit the proposed replacement personnel qualification and abilities to the Authority, in writing, for approval.

  • Trunking Requirements 7.2.2.9.1 The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.

  • Trunk Forecasting Requirements 14.2.1 Initial trunk forecast requirements. At least ninety (90) days before initiating interconnection in a LATA, Alltel shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

Time is Money Join Law Insider Premium to draft better contracts faster.