2Project Methodology Sample Clauses

2Project Methodology. AV’s methodology for large scale complex projects will be used to ensure that all elements of the project are appropriately considered and aligned. The major components of the design approach are: Development, design, build and test the Hawk30 Prototype Solar Stratospheric Aircraft System testing cellular connectivity @ 20km altitude station keeping and 6-month endurance through Flight Test and engineering analysis.
AutoNDA by SimpleDocs

Related to 2Project Methodology

  • Payment Methodology The Contractor shall be compensated based on the Service Rates in Attachment for units of service authorized by the Institution in a total amount not to exceed the Contract Maximum Liability established in Section C.1. The Contractor’s compensation shall be contingent upon the satisfactory completion of units of service or project milestones identified in Attachment B. The Contractor shall submit invoices, in form and substance acceptable to the Institution with all of the necessary supporting documentation, prior to any payment. Such invoices shall be submitted for completed units of service or project milestones for the amount stipulated.

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.

  • Claims Review Methodology a. C laims Review Population. A description of the Population subject to the Quarterly Claims Review.‌

  • Design Criteria and Standards All PROJECTS/SERVICES shall be performed in accordance with instructions, criteria and standards set forth by the DIRECTOR.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Methodology 1. The price at which the Assuming Institution sells or disposes of Qualified Financial Contracts will be deemed to be the fair market value of such contracts, if such sale or disposition occurs at prevailing market rates within a predefined timetable as agreed upon by the Assuming Institution and the Receiver.

  • Service Level Standards In addition to all other requirements in this Agreement, and in accordance with the Best Claims Practices & Estimating Guidelines, Vendor shall use reasonable and good faith efforts to meet the Service Level Standards set forth below.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order.

  • Particular Methods of Procurement of Goods Works and Services (other than Consultants’ Services)

Time is Money Join Law Insider Premium to draft better contracts faster.