Two-speed idle test definition

Two-speed idle test or "TSI" means a vehicle exhaust emissions test, performed in accordance with section (II) of 40 CFR Part 51, Appendix B to Subpart S, which measures the concentrations of pollutants in the exhaust gases of an engine (i) while the motor vehicle transmission is not propelling the vehicle and (ii) while the engine is operated at both curb idle and at a nominal engine speed of 2,500 rpm.
Two-speed idle test means a nontransient, steady−state emission test which measures exhaust emissions at idle using an infrared exhaust gas analyzer.
Two-speed idle test or " (TSI)" means a vehicle exhaust emissions test, performed in accordance with section (II) of 40 CFR Part 51, Appendix B to Subpart S, which measures the concentrations of pollutants in the exhaust gases of an engine

More Definitions of Two-speed idle test

Two-speed idle test as used in this section shall mean the test used to measure exhaust emissions at
Two-speed idle test means a tailpipe test in which a probe is inserted into the tailpipe of a vehicle to collect a sample of the exhaust. The Two Speed Idle (TSI) Test has two test modes. Exhaust gas measurements are made with the vehicle engine at idle (between 350 and 1,100 RPM) and at high idle (between 2,200 and 2,800 RPM). The test equipment will determine

Related to Two-speed idle test

  • Cannabis testing facility means an entity registered by

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Collateral Quality Tests means the Collateral Quality Tests set out in the Investment Management Agreement being each of the following:

  • Collateral Quality Test means a test that is satisfied if, as of any date of determination, in the aggregate, the Collateral Loans owned (or in relation to a proposed acquisition of a Collateral Loan, both owned and proposed to be owned) by the Borrower satisfy each of the tests set forth below, calculated in each case in accordance with Section 1.3:

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Fixed wing turbine powered aircraft means an aircraft that:

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Stand-Alone Test Environment or "SATE" shall have the meaning set forth in Section 12.2.9.3.2.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Contractor-acquired property means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract, and to which the Government has title.

  • Quality Surveillance Engineer / Inspector means any person appointed by or on behalf of the Purchaser to inspect or carry out quality surveillance on supplies, stores or work under the Contract or any person deputed by the Quality Surveillance Engineer for the said purpose.

  • Total resource cost test or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures, as well as other quantifiable societal benefits, including avoided natural gas utility costs, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases.

  • Goods Specification any specification for the Goods including any relevant plans or drawings, that is agreed in writing by the Reseller and Voip-Unlimited.

  • Independent Software Vendor or “ISV” means a Person that makes available to Participants and Authorized Traders a system or platform offering smart order routing, front-end trading applications, an aggregation platform or a combination of the foregoing but that does not provide Participants or Authorized Traders with the ability to effect transactions other than through the Trading System.

  • Double check valve assembly means an assembly composed of two single, independently acting, check valves including tightly closing shutoff valves located at each end of the assembly and suitable connections for testing the water tightness of each check valve.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Peer support specialist means an individual who has experienced a severe and persistent mental illness and who has successfully completed standardized training to provide peer support services through the medical assistance program or the Iowa Behavioral Health Care Plan.

  • Secondary dose monitoring system means a system which will terminate irradiation in the event of failure of the primary dose monitoring system.