Twangiza Project definition

Twangiza Project means the Properties and the mining operations developed, constructed and operated at and in respect of the Properties.

Examples of Twangiza Project in a sentence

  • Each of the Parties agrees that it will comply in all material respects with the Corruption of Foreign Public Officials Act (Canada), the Bribery Act (United Kingdom) and any other applicable anti-corruption legislation in connection with its dealings relating to this Agreement and the Twangiza Project.

  • Banro and the Seller shall comply with all Applicable Laws in all material respects, including without limitation, the World Gold Council Conflict-Free Gold Standard, with respect to all operations at the Twangiza Project.

  • NI 43-101 Technical Report, Twangiza Project, South Kivu Province, Democratic Republic of Congo.

  • Fourth NI 43-101 Technical Report, Twangiza Project, South Kivu Province, Democratic Republic of Congo.

  • The technical report dated March 6, 2007 and entitled “Fourth NI 43-101 Technical Report, Twangiza Project, South Kivu Province, Democratic Republic of the Congo” (the “ 2007 Twangiza Technical Report”).

  • In the event of a production stoppage at the Twangiza Project or a material reduction in Produced Gold from the Twangiza Project as a result of a Force Majeure Event that endures for more than 14 consecutive days, the Parties agree that the minimum amount of Payable Gold for the calendar year so impacted shall be reduced proportionately to take into account the production losses incurred as a result of the Force Majeure Event.

  • Interim Report: Twangiza Project, Democratic Republic of Congo, Africa, for Banro Resource Corporation.

  • The Seller shall also provide to the Purchaser on request together with the Monthly Reports, all other relevant Twangiza Project documentation or information that may have a material impact on the Twangiza Project, including the Operating Plan.

  • Twangiza Project, Democratic Republic of the Congo; Phase I Resource Modelling, unpublished report for CME and Company.

  • Minecon Resources www.mineconrsl.com 27 REFERENCESAnalytical Solutions Ltd, 2013: Imbo Project, DRC Soil Geochemistry, Prepared on behalf of Kilo Goldmines Ltd., October 2013.AngloGold Ashanti Limited, 2013: 2012 Annual Integrated Report, March 19, 2013.Banro Corporation, 2013: Twangiza Project, available athttp://www.banro.com/s/Twangiza.asp?ReportID=307249, accessed October 28, 2013.BHP-UTAH Minerals International, 1989: Report on Kitenge-Adumbi and Yindi.

Related to Twangiza Project

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • New Project means (a) each facility which is either a new facility, branch or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, branch or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.

  • Development Project means a project for the development of land within a

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Infrastructure project means any construction or acquisition of treatment works,

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Redevelopment project means any work or undertaking

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Ongoing Project means a multi-year project undertaken by a Company in fulfilment of its CSR obligation having timelines not exceeding three years excluding the financial year in which it was commenced, and shall include such project that was initially not approved as a multi-year project but whose duration has been extended beyond one year by the board based on reasonable justification;

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Economic development project means land and existing or planned improvements suitable for use by an industrial or commercial enterprise, or housing development, or the protection of the environment, including, but not limited to, groundwater or surface water. Economic development project includes necessary buildings, improvements, or structures suitable for and intended for or incidental to use as an industrial or commercial enterprise or housing development; and includes industrial park or industrial site improvements and port improvements or housing development incidental to an industrial or commercial enterprise; and includes the machinery, furnishings, and equipment necessary, suitable, intended for, or incidental to a commercial, industrial, or residential use in connection with the buildings or structures.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Development Area means that area to which a development plan is applicable.

  • Condominium Project Real estate including the separate ownership in fee, or on a satisfactory leasehold estate, of a particular residential unit with an indivisible interest in the real estate designated for common ownership strictly by unit owners.