OVERHAUL COST definition

OVERHAUL COST means the costs of labour and materials which are or would be incurred in overhaul or replacement (whichever is necessary) at the end of the Overhaul Life of the damaged or a similar Unit.
OVERHAUL COST means the costs of labour and materials which are or would be incurred in overhaul or replacement (whichever is necessary) at the end of the Overhaul Life of the damaged or a similar Unit. 5. "FLIGHT" means from the time the Aircraft moves forward in taking off or attempting to take off, whilst in the air, and until the Aircraft completes its landing run. A rotary-wing aircraft shall be deemed to be in Flight when the rotors are in motion as a result of engine power, the momentum generated therefrom, or autorotation. 6. "TAXIING" means movement of the Aircraft under its own power other than in Flight as defined above. Taxiing shall not be deemed to cease merely by reason of a temporary halting of the Aircraft. 7. "MOORED" means, in the case of aircraft designed to land on water, whilst the Aircraft is afloat and is not in Flight or Taxiing as defined above, and includes the risks of launching and hauling up.

Related to OVERHAUL COST

  • Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.

  • Trip Cost means the dollar amount of Trip payments or deposits paid by the Insured prior the Insured’s Trip Departure Date and shown on any required application which is subject to cancellation penalties or restrictions. Trip cost will also include the cost of any subsequent pre-paid payments or deposits paid by the Insured for the same Trip, after application for coverage under this plan provided the Insured amends the Application to add such subsequent payments or deposits and pays any required additional plan cost prior to the Insured’s Departure Date.

  • Project Cost means the costs incurred in connection with the

  • Contract Cost means the Contract Sum plus Price Variation. This cost shall be included in the letter of acceptance.

  • Normal cost means the annual cost attributable, under the actuarial cost method in use, to current and future years as of a particular valuation date, excluding any payment in respect of an unfunded actuarial liability.

  • Direct Cost means a cost not to exceed the cost of labor, material, travel and other expenditures to the extent the costs are directly incurred to provide the relevant assistance or service. “Direct Cost” to the Acquirer for its use of any of a Respondent’s employees’ labor shall not exceed the average hourly wage rate for such employee;

  • Life-cycle cost means the expected total cost of ownership during the life of a product, including disposal costs.

  • Cost means all expenditure properly incurred (or to be incurred) by the Contractor, whether on or off the Site, including overheads and similar charges but does not include any allowance for profit.

  • Contractor’s Equipment means all apparatus, machinery, vehicles and other things required for the execution and completion of the Works and the remedying of any defects. However, Contractor’s Equipment excludes Temporary Works, Employer’s Equipment (if any), Plant, Materials and any other things intended to form or forming part of the Equipment.

  • Manufacturing Cost means ***

  • Supplier Equipment means the Supplier's hardware, computer and telecoms devices, equipment, plant, materials and such other items supplied and used by the Supplier (but not hired, leased or loaned from the Customer) in the performance of its obligations under this Call Off Contract;

  • Major Equipment means the items of Equipment listed as such in Attachment G.

  • Net cost means the Contractor’s actual cost after deducting all permitted cash and trade discounts, rebates, allowances, credits, sales taxes, commissions, and refunds (whether or not any or all of the same shall have been taken by the Contractor) of all parts and materials purchased by the Contractor solely for the use in performing its obligation hereunder provided, where such purchase has received the prior written approval of the Manager as required herein. The Contractor shall promptly furnish to the Manager such bills of sale and other instruments as the Manger may require, executed, acknowledged and delivered, assuring to the Manager title to such materials, supplies, equipment, parts, and tools free of encumbrances.

  • Additional Cost has the meaning assigned to such term in Section 3.01.

  • Replacement Cost means the cost to repair or rebuild the improvements owned by Lessor at the time of the occurrence to their condition existing immediately prior thereto, including demolition, debris removal and upgrading required by the operation of applicable building codes, ordinances or laws, and without deduction for depreciation.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.