Incomplete or unfinished definition

Incomplete or unfinished means (i) that occupancy is not permitted under state or local law, or (ii) that the residence lacks fixtures or architectural appointments normally included in the design of any house of the general type and style of the residence or needed to provide adequate living space for the family members who intend to occupy the residence. The cost of completing the basement of a "hillside ranch" or the second floor of a "cape style" dwelling must be included in the acquisition cost only if the additional space is presently required for bedrooms or other basic living space or if the borrower intends to contract for completion of the additional space within two years of the closing date. Although neither a garage nor any other out building is necessarily a part of a residence, the cost of completing the same must be included in the acquisition cost if the design of the residence calls for a garage or an outbuilding. For instance, a dwelling sold with siding not completely installed on one wall will be deemed designed for the inclusion of an outbuilding or garage.

Examples of Incomplete or unfinished in a sentence

  • Incomplete or unfinished sections will be recorded in MB, but payment shall be released only when section is certified to be complete in all respect by the site in charge.

  • Incomplete or unfinished sections will be recorded in MB, but payment shall be released only when section is certified to be complete in all respect by the site in charge.If water drain or road gutter encountered along the road the depth shall be measured from the top surface of the water drain or road gutter.

  • Incomplete or unfinished sections will be recorded in MB, but payment shall be releasedonly when section is certified to be complete in all respect by the site in charge.If water drain or road gutter encountered along the road the depth shall be measured from the top surface of the water drain or road gutter.

  • Incomplete or unfinished work will not be accepted and no extra compensation will be granted for completion and finishing to standards acceptable to the Project Engineer.

  • Incomplete or unfinished class work constitutes homework, which serves to:● Reinforce the present day’s lesson● Help develop a sense of responsibility● Prepare for the next day’s lesson● Reinforce acquired skills / develop new ones● Incorporate available materials/media at homeAn allotted time for home study should be part of a student’s daily routine, regardless of whether specific assignments have been given.

  • Incomplete or unfinished class work constitutes homework.Homework serves to:• Reinforce the present day’s lesson• Help develop a sense of responsibility• Prepare for the next day’s lesson• Reinforce acquired skills and develop newones• Teach a sense of responsibility• Incorporate available materials and media inthe home:• Books, magazines, newspapers, television.An allotted time for home study should be part of a student’s daily routine, regardless ofwhether specific assignments have been given.

  • General Rule of Interpretation (GRI) No. 22 (a) Incomplete or unfinished articles: Any reference in a heading to an article shall be taken to include a reference to that article incomplete or unfinished, provided that, as entered, the incomplete or unfinished article has the essential character of the complete or finished article.

  • Incomplete or unfinished sections will be recorded in MB, but payment shall be released only when section is certified to be complete in all respect by the site in charge.If water drain or road gutter encountered along t he road the depth shall be measured from the top surface of the water drain or road gutter.

  • The following specific exemptions were identified for Brazil: Incomplete or unfinished vehicles Vehicles to be exported Tractor trucks Vehicles constructed especially for self-carrying or very long cargoes Vehicles in which the attachment of the specified rear guard is incompatible with their use Vehicles with the rear guard incorporated in their body according to the manufacturer’s original design Military vehicles Collector’s vehicles No additional information was identified.

  • Incomplete or unfinished sections will be recorded in MB, but payment shall be released only when section is certified tobe complete in all respect by the site in charge.

Related to Incomplete or unfinished

  • incomplete vehicle means any vehicle which must undergo at least one further stage of completion in order to meet the relevant technical requirements of this Directive;

  • Material Taking shall have the meaning set forth in Section 6.4.

  • Serialization within the part, lot, or batch number means each item of a particular part, lot, or batch number is assigned a unique serial number within that part, lot, or batch number assignment. The enterprise is responsible for ensuring unique serialization within the part, lot, or batch number within the enterprise identifier.

  • Construction in Progress means each Property that is either (a) new ground up construction or (b) under renovation in which (i) greater than thirty percent (30%) of the square footage of such Property is unavailable for occupancy due to renovation and (ii) no rents are being paid on such square footage. A Property will cease to be classified as “Construction in Progress” on the earlier to occur of (A) the time that such Property has an Occupancy Rate of greater than eighty percent (80%), or (B) one hundred eighty (180) days after completion of construction or renovation of such Property, as applicable.

  • Substantial Taking means a Taking of at least 15% of the Land or Improvements which, in Lessee’s and Lessor’s reasonable judgment, will materially and adversely interfere with any development or use of the Premises that Lessee is then conducting or intends in good faith to conduct in the future.

  • Work in Progress means a Deliverable that has been partially prepared, but has not been presented to the State for Approval.

  • Nonconformity or “Nonconformities” means any failure or failures of the Software to conform to the requirements of this Contract, including any applicable Documentation.

  • Construction-in-Process means cash expenditures for land and improvements (including indirect costs internally allocated and development costs) determined in accordance with GAAP for all Properties that are under development or will commence development within twelve months from any date of determination.

  • Test Incomplete has the meaning stated in Section 3.4(a).

  • Material of Environmental Concern means and includes pollutants, contaminants, hazardous wastes, and toxic, radioactive, caustic or otherwise hazardous substances, including petroleum, its derivatives, by-products and other hydrocarbons, or any substance having any constituent elements displaying any of the foregoing characteristics.

  • Material Gas Imbalance means, at any time, with respect to all Gas Balancing Agreements to which any Credit Party is a party or by which any Mineral Interest owned by any Credit Party is bound, a net gas imbalance at such time to all such Credit Parties in excess of, in the aggregate, three percent (3%) of the Borrowing Base then in effect.

  • Work in Process means a Deliverable that has been partially prepared, but has not been presented to the State for Approval.

  • Material Property means all Real Property owned in fee in the United States by any Credit Party, in each case, with a fair market value of $7,425,000 (as determined by the Borrower in good faith) or more, as determined (i) with respect to any Real Property owned by any Credit Party on the Closing Date, as of the Closing Date, and (ii) with respect to any Real Property acquired by a Credit Party after the Closing Date, as of the date of such acquisition.

  • Substitute Improvements means the substitute or additional improvements of the Issuer described in Article V hereof.

  • Material Condemnation has the meaning set forth in Section 14.2.1.

  • Raw Materials means all raw materials, supplies, components and packaging necessary to manufacture and ship the Product in accordance with the Specifications, as provided in Exhibit A, but not including the API.

  • Material Environmental Liabilities means Environmental Liabilities exceeding $500,000 in the aggregate.

  • complete vehicle means any vehicle which need not be completed in order to meet the relevant technical requirements of this Directive;

  • Material Project means the construction or expansion of any capital project of the Borrower or any of its Subsidiaries, the aggregate capital cost of which exceeds $25,000,000.

  • Certified components means components of X-ray systems which are subject to regulations promulgated under Public Law 90-602, the “Radiation Control for Health and Safety Act of 1968,” the Food and Drug Administration.

  • Environmental Activities means the use, generation, transportation, handling, discharge, production, treatment, storage, release or disposal of any Hazardous Materials at any time to or from any portion of the Premises or located on or present on or under any portion of the Premises.

  • Finished Lots means, Entitled Land (i) that has been legally subdivided for the construction of Housing Units, (ii) that has been graded substantially in accordance with all grading plans approved by the applicable agencies and contains level building pads (except for any fine or precise grading to be completed immediately prior to vertical construction), (iii) that has all water, sewer, electrical and other utility services for planned residences installed and stubbed to the lot behind the sidewalk, (iv) that has all storm drain, sewer, curb, gutter, sidewalk and pavement for public access constructed and installed, except for any final lift of the streets and lateral connections to Housing Units, (v) that has all property corners surveyed and marked and any required survey monumentation installed, and (vi) with respect to which all applicable development fees (including, without limitation, school and development impact fees) that are required to be paid prior to obtaining a building permit have been paid other than building permit and plan check fees. Except as otherwise expressly provided in this Agreement, the term “Finished Lot” shall not include any Land upon which the construction of a Housing Unit has commenced.

  • Certified rehabilitation means any rehabilitation of a certified historic structure

  • Nonconforming use means a use of land that:

  • Nonconforming lot means a lot that met dimensional requirements of the applicable master program at the time of its establishment but now contains less than the required width, depth or area due to subsequent changes to the master program.

  • Reconstruction means the replacement of components of an existing facility to such an extent that: