Comprehensive stormwater management plan definition

Comprehensive stormwater management plan means a plan, which may be integrated with other land use plans or regulations, that specifies how the water quality components, quantity components, or both of stormwater are to be managed on the basis of an entire watershed or a portion thereof. The plan may also provide for the remediation of erosion, flooding, and water quality and quantity problems caused by prior development.
Comprehensive stormwater management plan means a plan, which may be
Comprehensive stormwater management plan means a plan, which may be integrated with other land development plans or regulations, that spells out how the water quality and quantity components of stormwater are to be managed on a watershed-wide basis.

More Definitions of Comprehensive stormwater management plan

Comprehensive stormwater management plan means a plan, which may be integrated with other land use plans or regulations that specifies how the water quality and quantity components of stormwater are to be managed on a watershed-wide basis.
Comprehensive stormwater management plan means a plan, which may be integrated with other land use plans or regulations, that specifies how the water quality components, quantity components, or both of stormwater are to be managed on the basis of an entire
Comprehensive stormwater management plan means the written document and plans meeting the requirements of Chapter 961 that describes and specifies practices, facilities and improvements to minimize stormwater runoff from a development area, to safely convey or temporarily store and release post-development runoff at a rate that minimizes flooding and stream bank erosion, and protects or improves stormwater quality and stream channels.

Related to Comprehensive stormwater management plan

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Adopt a comprehensive land use plan means to enact a new

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Comprehensive Plan means a generalized, coordinated land use map and policy statement of the governing body of a local government that interrelates all functional and natural systems and activities relating to the use of lands, including but not limited to sewer and water systems, trans- portation systems, educational facilities, recreational facilities, and natural resources and air and water quality management programs. “Comprehensive” means all-inclusive, both in terms of the geographic area covered and functional and natural activities and systems occurring in the area covered by the plan. “General nature” means a summary of policies and proposals in broad catego- ries and does not necessarily indicate specific locations of any area, activity or use. A plan is “co- ordinated” when the needs of all levels of governments, semipublic and private agencies and the citizens of Oregon have been considered and accommodated as much as possible. “Land” includes water, both surface and subsurface, and the air.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Comprehensive assessment means the gathering of relevant social, psychological, medical and level of care information by the case manager and is used as a basis for the development of the consumer service plan.

  • Stormwater management system means any equipment, plants,

  • Comprehensive resource analysis means an analysis including,

  • Comprehensive means an assistance program that focuses on

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

  • Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Comprehensive agreement means the comprehensive agreement between the private entity and the responsible public entity that is required prior to the development or operation of a qualifying project.

  • Project Management Plan means the portion of the Project Development Plan providing the information requested in Section 4.2 of Exhibit B to the ITP.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Biological safety cabinet means a containment unit suitable for the preparation of low to moderate risk agents where there is a need for protection of the product, personnel, and environment, according to National Sanitation Foundation (NSF) Standard 49.

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • disaster management means a continuous and integrated process of planning, organising, coordinating and implementing measures which are necessary or expedient for—

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);

  • Environmental Management Plan or “EMP” means the environmental management plan for the Project, including any update thereto, incorporated in the IEE;

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Safety Management System means a systematic approach to managing safety, including the necessary organisational structures, accountabilities, policies and procedures;