Stormwater management BMP definition

Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).
Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a
Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may

Examples of Stormwater management BMP in a sentence

  • Stormwater management BMP- An excavation or embankment and related areas designed to retain stormwater runoff.

  • Stormwater management BMP projects would also be implemented during this segment to reduce the negative effects of stormwater discharge on fecal bacteria levels in Spring Creek.

  • Stormwater management BMP to control or abate the discharge of pollutants when authorized under section 402(p) of the Clear Water Act (CWA) for the control of Stormwater discharges.

  • The SMP shall include a long-term Stormwater management BMP inspection and maintenance plan that describes the responsible parties and contact information for the qualified individuals who will perform future BMP inspections.

  • These providers include Salesforce, whose operations are located in Japan and the United States of America.I undertake to comply with all relevant legislation, Board registration standards, codes, and guidelines.I confirm that I have read the privacy and confidentiality statement for this form.

  • Stormwater management BMP shall mean an excavation or embankment and related areas designed to retain stormwater runoff.

  • Proposed improvements including location of buildings, structures, utilities, impervious surfaces, Stormwater management BMP, roof drainage discharge location, property lines, insurance rate map zone designations and flood elevation.

  • Stormwater management BMP shall be designed to meet the minimum safety standards for stormwater management basins at § 362-8.

  • Stormwater management BMP signage should be provided as required in Section 3.5 of the Stormwater Design Manual.15.


More Definitions of Stormwater management BMP

Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or
Stormwater management BMP means an excavation or embankment and related areas

Related to Stormwater management BMP

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management basin means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.

  • Stormwater management system means any equipment, plants,

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Storm water management plan means a comprehensive plan designed to reduce the discharge of pollutants from storm water after the site has under gone final stabilization following completion of the construction activity.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Stormwater runoff means water flow on the surface of the ground or in storm sewers, resulting from precipitation.

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

  • Stormwater means water resulting from precipitation (including rain and snow) that runs off the land’s surface, is transmitted to the subsurface, or is captured by separate storm sewers or other sewage or drainage facilities, or conveyed by snow removal equipment.

  • disaster management means a continuous and integrated process of planning, organising, coordinating and implementing measures which are necessary or expedient for—

  • Utilization management section means “you or your authorized representative.” Your representative will also receive all notices and benefit determinations.

  • Project Management The individuals appointed by each Party cf. clause 4.1 in the Agreement.

  • Water Main means (subject to Section 219(2) of the 1991 Act) any pipe, not being a pipe for the time being vested in a person other than the water undertaker, which is used or to be used by a water undertaker or licensed water supplier for the purpose of making a general supply of water available to customers or potential customers of the undertaker or supplier, as distinct from for the purpose of providing a supply to particular customers;

  • Project Management Agreement means the agreement dated the 20th February 1985 made between the Trustee and the Manager providing for the Manager to manage and co‑ordinate the development and construction of the Resort and includes, if that agreement is terminated, any other agreement in like and similar terms made with the prior consent of the Minister;

  • Construction Management Agreement means the Construction Management Agreement, dated as of the date of the Common Agreement, between Construction Manager and the Project Company.

  • Environmental Management Framework or “EMF” means the Environmental Management Framework adopted in April 2009 by IDCOL (as hereinafter defined) detailing the measures proposed to address the adverse environmental and social impact of investments under the Project.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Project Management Unit and “PMU” mean the Project Management Unit established and maintained in accordance with the provisions of paragraph 2, Section I(A) of Schedule 2 to this Agreement.

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Procurement Management means the Director of Lee County’s Procurement Management Department or designee.