Complete Demolition definition

Complete Demolition means removal of all above-grade portions of a designated historic resource.
Complete Demolition means removal of all above-grade portions of a designated historic resource. "Demolition" means destruction or removal that is so extensive that the historic character of a

Examples of Complete Demolition in a sentence

  • One or more of Investigative Demolition, Connective Demolition, Partial Demolition, Substantial Demolition, or Complete Demolition, as the context requires.

  • Lump-Sum Contract Item Amount Complete Demolition, Waste Removal, and New Construction$ 340,000** State and Local Sales Tax (8.25% x $340,000) $ 28,050Total $ 368,050 **Again, because the waste removal service exceeds 5 percent of the single charge (i.e., is not separately stated), the entire service is presumed to be for taxable waste removal services.

  • Award to Complete Demolition, the lowest responsive and responsible bidder in the amount of $322,000.00.

  • The low bidder, Complete Demolition Services, was rejected, after review by staff and the LMHA attorney, as being unresponsive.

  • Complete Demolition of activities identified in the Scope of Work, Section I.A., which may include the following components:  Notice to Proceed (NTP);  Contractor obtains all permits and utility costs;  Conduct inspections (based on a percentage complete when requesting payment);  Conduct final walkthrough;  Process payments.

  • Awarded to Complete Demolition Services, LLC and Diversified Environmental Management, Inc.

  • The potential scope is effectively broken down into five main categories;- Do-Nothing.- Complete Demolition.- Timber Pier Conservation.- New Timber Pier- Sheet Piling Options A summary of the advantages, disadvantages and costs associated with the options is provided in Appendix D and the reminder of this chapter provides detail on the consideration given to each option.

  • RESOLUTION: To Authorize Demolition of the Dilapidated Structure Located at 620 Japonica Road and to Award a Contract to J.B. Waste Connection to Complete Demolition at a Cost Not to Exceed $5,800.00.

  • On August 8, 2018, the Board approved the award for WBES Above Grade Demolition Services to Complete Demolition Services, LLC for a one-time cost of $192,000.

  • Complete Demolition Permit – applicant to provide the following:1.

Related to Complete Demolition

  • Demolition means the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility.

  • demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;

  • Demolition works means any physical activity to tear down or break up a structure (or part thereof) or surface, or the like, and includes the loading of demolition waste and the unloading of plant or machinery.

  • Construction and demolition debris means and includes:

  • Demolition waste means that solid waste that is produced by the destruction of structures, or their foundations, or both, and includes the same materials as construction waste.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Renovation means altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component. Operations in which load-supporting structural members are wrecked or taken out are demolitions.

  • Certificate of Substantial Completion means the certificate executed by the A/E, ODR and Contractor that documents to the best of A/E’s and ODR’s knowledge and understanding, Contractor’s sufficient completion of the work in accordance with the Contract, so as to be operational and fit for the use intended.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Landlord’s Work means the work of constructing the Tenant Improvements.

  • Substantial Completion Date means the date on which Substantial Completion occurs.

  • aerial work means an aircraft operation in which an aircraft is used for specialised services such as agriculture, construction, photography, surveying, observation and patrol, search and rescue, and aerial advertisement;

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • this Tenant Work Letter means the relevant portion of Sections 1 through 6 of this Tenant Work Letter.

  • construction work permit means a document issued in terms of regulation 3; "contractor" means an employer who performs construction work;

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • Tenant Work All work installed or furnished to the Premises by Tenant in connection with Tenant’s initial occupancy pursuant to Rider 2 and the Workletter.

  • Leasehold Improvements means all buildings, structures, improvements and fixtures located on any Leased Real Property which are owned by Company or any Company Subsidiary, regardless of whether title to such buildings, structures, improvements or fixtures are subject to reversion to the landlord or other third party upon the expiration or termination of the lease for such Leased Real Property.

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • Guaranteed Substantial Completion Date or “Guaranteed Substantial Completion Dates” has the meaning set forth in Section 5.3B.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Substitute Improvements means the substitute or additional improvements of the Issuer described in Article V hereof.