Bega Cheese On Farm Quality Assurance Program definition

Bega Cheese On Farm Quality Assurance Program means the program set out in the manual dated May 2022 provided by us to you at the same time as this Agreement is provided. BMCC means bulk milk cell count.
Bega Cheese On Farm Quality Assurance Program means the program set out in the manual dated May 2022 provided by us to you at the same time as this Agreement is provided. BMCC/SCC Geometric Mean means a 13 week geometric mean calculation of BMCC/SCC.

Examples of Bega Cheese On Farm Quality Assurance Program in a sentence

  • The first weight distribution was a discrete uniform distribution with integer values from [1, 50], while the second was a discrete uniform distribution over [501, 550], and the third was a discrete uniform distribution over [951, 1000].We compared the total cost for the Huffman scheme with the cost of the butter- fly scheme, the ING scheme, the GDH.1/2 scheme, and the GDH.3 scheme.

Related to Bega Cheese On Farm Quality Assurance Program

  • Quality Assurance Program means the overall quality program and associated activities including the Department’s Quality Assurance, Design-Builder Quality Control, the Contract’s quality requirements for design and construction to assure compliance with Department Specifications and procedures.

  • Quality Assurance Plan or “QAP” shall have the meaning set forth in Clause 11.2;

  • Radiopharmaceutical quality assurance means, but is not limited to, the performance of appropriate chemical, biological, and physical tests on potential radiopharmaceuticals and the interpretation of the resulting data to determine their suitability for use in humans and animals, including internal test assessment, authentication of product history, and the keeping of proper records.

  • Quality Assurance means a systematic procedure for assessing the effectiveness, efficiency, and appropriateness of services.

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • National Ambient Air Quality Standards or “NAAQS” means national ambient air quality standards that are promulgated pursuant to Section 109 of the Act, 42 U.S.C. § 7409.

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • High Quality Waters means all state waters, except:

  • Ambient air quality standard means an established concentration, exposure time, and frequency of occurrence of air contaminant(s) in the ambient air which shall not be exceeded.

  • Safety Management System has the meaning given to it in the ISM Code.

  • PJM Reliability Assurance Agreement means that certain Reliability Assurance Agreement Among Load Serving Entities in the PJM Region, on file with FERC as PJM Interconnection L.L.C. Rate Schedule FERC No. 44, and as amended from time to time thereafter. Schedule of Work:

  • Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • Designated chemical dependency specialist means a person

  • Comprehensive resource analysis means an analysis including,

  • Medical Specialist means any medical practitioner who is vocationally registered by the Medical Council under the Health Practitioners Competence Assurance Act 2003 in one of the approved branches of medicine and who is employed in either that branch of medicine or in a similar capacity with minimal oversight.

  • health and safety specification means a site, activity or project specific document prepared by the client pertaining to all health and safety requirements related to construction work;

  • Procurement Plan means the Recipient’s procurement plan for the Project, dated April 2, 2010, and referred to in paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines, as the same shall be updated from time to time in accordance with the provisions of said paragraphs.

  • Nutrient management plan means a plan developed or approved by the Department of Conservation and Recreation that requires proper storage, treatment and management of poultry waste, including dry litter, and limits accumulation of excess nutrients in soils and leaching or discharge of nutrients into state waters.

  • Biological safety cabinet means a containment unit suitable for the preparation of low to moderate risk agents where there is a need for protection of the product, personnel, and environment, according to National Sanitation Foundation (NSF) Standard 49.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Home health aide services means the personal care and maintenance activities provided to individuals for the purpose of promoting normal standards of health and hygiene.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.

  • Environmental and Social Management Plan or “ESMP” means a site-specific environmental and social management plan to be prepared in accordance with the parameters laid down in the ESMF and acceptable to the Association, setting forth a set of mitigation, monitoring, and institutional measures to be taken during the implementation and operation of the Project activities to eliminate adverse environmental and social impacts, offset them, or reduce them to acceptable levels, and including the actions needed to implement these measures.