Basic gate propagation delay time definition

Basic gate propagation delay time. (3) means the propagation delay time value corresponding to the basic gate used in a "monolithic integrated circuit". For a 'family' of "monolithic integrated circuits", this may be specified either as the propagation delay time per typical gate within the given 'family' or as the typical propagation delay time per gate within the given 'family'.
Basic gate propagation delay time. (Category 3) means the propagation delay time value corresponding to the basic gate used in a “monolithic integrated circuit”. For a ‘family’ of “monolithic integrated circuits”, this may be specified either as the propagation delay time per typical gate within the given ‘family’ or as the typical propagation delay time per gate within the given ‘family’; Note 1“Basic gate propagation delay time” is not to be confused with the input or output delay time of a complex “monolithic integrated circuit”. Note 2‘Family’ consists of all integrated circuits to which all of the following are applied as their manufacturing methodology and specifications except their respective functions: a. The common hardware and software architecture; b. The common design and process technology; and c. The common basic characteristics. “bias” (accelerometer) (Category 7) means the average over a specified time of accelerometer output, measured at specified operating conditions, that has no correlation with input acceleration or rotation. “Bias” (accelerometer) is expressed in g or in metres per second squared (g or m/s2). (Ref. IEEE Std 528-2001) (Micro g equals 1 × 10-6 g); “bias” (gyro) (Category 7) means the average over a specified time of gyro output, measured at specified operating conditions, that has no correlation with input rotation or acceleration. “Bias” (gyro) is typically expressed in degrees per hour (deg/hr). (Ref. IEEE Std 528-2001); “biological agents” (Category 1) means pathogens or toxins, selected or modified (such as altering the purity, shelf life, virulence, dissemination characteristics, or resistance to UV radiation) to produce casualties in humans or animals, degrade equipment or damage crops or the environment; “camming” (Category 2) means axial displacement in one revolution of the main spindle measured in a plane perpendicular to the spindle faceplate, at a point next to the circumference of the spindle faceplate (Ref. ISO 230-1:1986, paragraph 5.63); “chemical laser” (Category 6) means a “laser” in which the excited species is produced by the output energy from a chemical reaction;
Basic gate propagation delay time. (3) means the propagation delay time value corresponding to the basic gate used in a «monolithic integrated circuit». For a «family» of

More Definitions of Basic gate propagation delay time

Basic gate propagation delay time. (3) means the propagation delay time value corresponding to the basic gate used in a "monolithic integrated circuit". For a 'family' of "monolithic integrated circuits", this may be specified either as the propagation

Related to Basic gate propagation delay time

  • Commercial Operation Date (COD) means the date certified by the DISCOM’s committee upon successful commissioning (as per provisions of the PPA) of the project when all equipments as per rated capacity have been installed and energy has flown into the grid.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity

  • Final Completion Date means the date on which Final Completion occurs.

  • X-ray tube means any electron tube which is designed to be used primarily for the production of X-rays.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Maximum residual disinfectant level or “MRDL” means a level of a disinfectant added for water treatment that may not be exceeded at the consumer’s tap without an unacceptable possibility of adverse health effects.

  • Scheduled Completion Date shall be the date set forth in Clause 10.3;

  • Substantial Completion Date means the date on which Substantial Completion occurs.

  • Subproject means a specific activity financed, or proposed to be financed through a FOSAP Grant under Part B.1 of the Project.

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.

  • Commercial Operation Date means the date on which a Material Project is substantially complete and commercially operable.

  • Installation Date means the date specified in the Statement of Work by which the Contractor must have the ordered Equipment ready (certified) for use by the State.

  • Class C Coverage Tests means the Class C Interest Coverage Test and the Class C Par Value Test.

  • Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.

  • Billing Commencement Date means the earlier of:

  • Completion Rate means the percentage of an apprenticeship cohort who receives a certificate of apprenticeship completion within 1 year of the projected completion date. An apprenticeship cohort is the group of individual apprentices registered to a specific program during a 1 year time frame, except that a cohort does not include the apprentices whose apprenticeship agreement has been cancelled during the probationary period or who have transferred.

  • Notice to Proceed (NTP) means the authorization issued by the CO to start performance on this Contract.