Metering Date definition

Metering Date for a Billing Period, means the midnight of the last Day of the calendar month.
Metering Date means the first Business day of each calendar month subsequent to the month in which the Solar Power is generated by the Power Producer. The billable units shall be equal to the difference between the meter reading on the Metering Date and the meter reading on the previous month's Metering Date.
Metering Date means the first Business Day of each calendar month subsequent to the month in which the Solar Power is generated by the Solar Power Developer. The billable units shall be equal to the difference between the meter reading on the Metering Date and the meter reading on the previous month’s Metering Date;

Examples of Metering Date in a sentence

  • The billable units shall be equal to the difference between the meter reading on the Metering Date and the meter reading on the previous month's Metering Date.(bb) "Party" or Parties" has the meaning set forth in the preamble to this Agreement.(cc) "Performance Ratio" (PR) means the ratio of plant output versus installed plant capacity at any instance with respect to the radiation measured.


More Definitions of Metering Date

Metering Date for a Billing Period, means the midnight of the last Day of the calendar month. “Metering Pointfor purposes of recording of Injected Energy located at Injection Point.
Metering Date for a Billing Period, means midnight of the last Day of the calendar month. “Metering Pointfor purposes of recording of Delivered Energy at the Delivery Point and shall include two separate sets of electronic trivector meters, main meter installed by the Company and check meter installed by the Corporation and both sealed by Corporation, having, facilities to record both export and import of Electricity to/from the grid.
Metering Date for a Billing Period, means the midnight (24.00 hours) of the last day of a calendar month;
Metering Date for a Billing Period, means the midnight of the last Day of the calendar month. Metering Point: The metering point shall be at the existing interconnection point(s) of existing projects. “Monthly Charge” shall have the meaning set forth in Article 5.
Metering Date means the first Business day of each calendar month
Metering Date for a Billing Period, means midnight of the last Day of the calendar month. “Metering Pointfor purposes of recording of Delivered Energy at the Delivery Point and shall include two separate sets of electronic tri- vector meters, main meter installed by the Company and check meter installed by the …ESCOM and both sealed by the …ESCOM, having, facilities to record both export and import of electricity to/from the grid “ Metering” for purposes of recording of Delivered Energy at the Delivery Point and shall include two separate sets of electronic tri-vector meters, main meter installed by the Company and the check meter installed by the …ESCOM and both sealed by the …ESCOM, having, facilities to record both export and import of electricity to/from the grid. “Monthly Charge” shall have the meaning set forth in Article 5 Deleted “Tariff Invoices” shall have the meaning set forth in Article 6. Deleted “MW” means Megawatts. “MW” means Megawatts. “O & M Default” shall mean any default on the part of the Company for a continuous period of ninety (90) days to (i) operate and/or (ii) maintain (in accordance with Prudent Utility Practices), the Project at all times during the period of availability of Fuel for generation. “O & M Default” shall mean any default on the part of the Company for a continuous period of ninety (90) days to (i) operate and/or (ii) maintain (in accordance with Prudent Utility Practices), the Project at all times during the period of availability of Fuel for generation.. “Project” means a Biomass Based/Agricultural Residue Based Power Station proposed to be established by the Company at ..................................... in Karnataka State comprising of Units with an individual capacity of MW and a total installed capacity of ......MW and shall include land, buildings, plant, machinery, ancillary equipment, material, switchgear, transformers, protection equipment and the like necessary to deliver the Electricity generated by the Project to …… ESCOM at the Delivery Point. “Project” means a Biomass Based/Agricultural Residue Based Power Station proposed to be established by the Company at .....................................
Metering Date for a Billing Period, means the midnight of the last Day of the calendar month. “Metering point” shall mean the point at 220 kV side of 400/220 kV Dholera SIR Sub-Station of GETCO. However, one more metering system is to be installed at 33 kV side of 220/33 kV Internal Pooling Sub-station where power from the Solar Power Project is injected for measuring export / import from each project. Energy recorded in the meter placed at STU Substation shall be apportioned to each project in the proportion of energy recorded in the meters placed at Pooling Substation.