WRC Sweeper Source Energy Budget Sample Clauses

WRC Sweeper Source Energy Budget. The AWI transceiver has a shorter pressure case that can hold only 30 battery modules, rather than the 37 modules that the two NERSC transceivers can hold. The source itself and the STAR use different kind of battery modules. The 45 V is used for the source and the 15 V is used for the STAR. A relatively large safety margin for the STARs has been chosen, since they have never been deployed for two years. It is essential that the STARs not exhaust their batteries. NERSC sources devote 12 modules and the AWI source devote 8 modules to the STARs, under the assumption that the NERSC sources will be deployed for two years and the AWI source for one year (or perhaps a bit more). The remaining modules will be 45 V modules for source power. There will therefore be 25 of the 45 V modules in the two NERSC sources and 22 of the 45 V modules in the AWI source. To summarize the battery distribution will be: • NERSC -1 and 2: 25 of the 45 V modules, 12 modules at 15 V for the STAR • AWI : 22 of the 45 V modules, 8 modules at 15 V for the STAR The sources will transmit the following signals: Tomography transmission: 60 s LFM sweep @ 190 xX XXXXX transmission: 80 s LFM sweep, 259.375–260.898 Hz @ 181 dB. The new NERSC #2 and the refurbished AWI source have higher current drains than the NERSC #1 source. Source characteristics are described in Table 10.
AutoNDA by SimpleDocs

Related to WRC Sweeper Source Energy Budget

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Procurement Plan 8. The Borrower shall update the Procurement Plan as needed throughout implementation of the Project, and on each anniversary of the Effective Date, the Borrower shall in consultation with ADB determine whether the Procurement Plan needs to be updated. The Borrower shall implement the Procurement Plan in the manner in which it has been approved by ADB.

  • Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic DHCS PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than 24 hours.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Network Resource Interconnection Service (check if selected)

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Flexible Working Arrangements In accordance with the Employment Relations Act 2000, an employee affected by family violence may request a short-term (two months or less) variation of their employment arrangements to assist the employee to deal with the effects of family violence.

  • Required Services Consultant agrees to perform the services, and deliver to City the “Deliverables” (if any) described in the attached Exhibit A, incorporated into the Agreement by this reference, within the time frames set forth therein, time being of the essence for this Agreement. The services and/or Deliverables described in Exhibit A shall be referred to herein as the “Required Services.”