UNDERUTILIZATION OF ELECTRIC POWER CONNECTIONS Sample Clauses

UNDERUTILIZATION OF ELECTRIC POWER CONNECTIONS. Issue 1: Another reoccurring issue at the XXXXXX facility is the underutilization of the electrification system. Since the installation of this system, only four of the twelve plug-in ports have been used. On average, one stall is used per month and this single stall is normally only used 4 or 5 days of the month, which is drastically less than what was expected. At the beginning of the project, XXXXXX management discussed approaches to integrate operational changes to maximize use of the electrification system, but these changes were never fully implemented for several reasons. When the electrical system was taken off­ line, trailers that are not electric-powered TRUs were stored in many of the connection berths in the parking lot (see Figure 5-1). Also, as XXXXXX operations changed, the fleet of trailers originally assigned to scheduled delivery routes servicing the cruise ship terminals on the New England and Mid-Atlantic coast we rerouted. As these trailers were rerouted to other clients and were no longer dedicated to the cruise ship clients, this change in operations significantly affected utilization of the electric connections as the cruise ship trailers were loaded several days in advance for just in time delivery at the terminals. The considerable amount of idle time at the facility would have significantly increased the utilization of the electrical system.
AutoNDA by SimpleDocs

Related to UNDERUTILIZATION OF ELECTRIC POWER CONNECTIONS

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Internet Connection In order to ensure the proper functioning of the Production Monitor and the Consumption Monitor, if possible, you must provide the Solar System with continuous access to a functioning broadband internet connection with one (1) wired Ethernet port and standard electrical outlet, at your cost. If you are unable to provide the Solar System with an internet connection in accordance with the foregoing sentence, the Home must be located in an area with cellular service that is acceptable to us in our discretion.

  • UTILITIES & SERVICES Landlord shall provide, subject to the terms of this Section 11, water, electricity, heat, air conditioning, light, power, sewer, and other utilities (including gas and fire sprinklers to the extent the Project is plumbed for such services), refuse and trash collection and janitorial services (collectively, “Utilities”). Landlord shall pay, as Operating Expenses or subject to Tenant’s reimbursement obligation, for all Utilities used on the Premises, all maintenance charges for Utilities, and any storm sewer charges or other similar charges for Utilities imposed by any Governmental Authority or Utility provider, and any taxes, penalties, surcharges or similar charges thereon. Landlord shall not cause any Utilities to the Premises which are not currently separately metered to be separately metered. Tenant shall pay directly to the Utility provider, prior to delinquency, any separately metered Utilities and services which may be furnished to Tenant or the Premises during the Term. Tenant shall pay, as part of Operating Expenses, its share of all charges for jointly metered Utilities based upon consumption, as reasonably determined by Landlord. No interruption or failure of Utilities, from any cause whatsoever other than Landlord’s willful misconduct, shall result in eviction or constructive eviction of Tenant, termination of this Lease or the abatement of Rent. Tenant agrees to limit use of water and sewer with respect to Common Areas to normal restroom use. Landlord’s sole obligation for either providing emergency generators or providing emergency back-up power to Tenant shall be: (i) to provide emergency generators with not less than the capacity of the emergency generators located in the Building as of the Commencement Date, and (ii) to contract with a third party to maintain the emergency generators as per the manufacturer’s standard maintenance guidelines. Landlord shall have no obligation to provide Tenant with operational emergency generators or back-up power or to supervise, oversee or confirm that the third party maintaining the emergency generators is maintaining the generators as per the manufacturer’s standard guidelines or otherwise. During any period of replacement, repair or maintenance of the emergency generators when the emergency generators are not operational, including any delays thereto due to the inability to obtain parts or replacement equipment, Landlord shall have no obligation to provide Tenant with an alternative back-up generator or generators or alternative sources of back-up power. Tenant expressly acknowledges and agrees that Landlord does not guaranty that such emergency generators will be operational at all times or that emergency power will be available to the Premises when needed.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Internet Connectivity School must provide sufficient hardline internet connectivity and the required network configurations (provided in Exhibit A) for each Pixellot System to allow live broadcasts. PlayOn will provide the point-to-point wireless internet base station (“Point to Point”) when needed to deliver hardline internet connectivity to Pixellot Systems installed in outdoor venues; provided that PlayOn is able to select the make and model of the Point to Point system. In the event that School requests, or requires, a specific Point to Point system that is different from what is provided by PlayOn, then School must provide and install the Point to Point system at its own expense.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Foreign-Owned Companies in Connection with Critical Infrastructure If Texas Government Code, Section 2274.0102(a)(1) (relating to prohibition on contracts with certain foreign-owned companies in connection with critical infrastructure) is applicable to this Contract, pursuant to Government Code Section 2274.0102, Contractor certifies that neither it nor its parent company, nor any affiliate of Contractor or its parent company, is: (1) majority owned or controlled by citizens or governmental entities of China, Iran, North Korea, Russia, or any other country designated by the Governor under Government Code Section 2274.0103, or (2) headquartered in any of those countries.