Total Sulfur and Sulfur species Sample Clauses

Total Sulfur and Sulfur species. Total Sulfur shall be analyzed quarterly in a certified laboratory during the first year of supply. Sulfur species concentrations shall be identified and compared with the concentration of total sulfur. After typical values are determined and no corrosive sulfur is present - then the frequency can be lowered (twice a year in the second year and annually afterwards). If, however, concentrations greater than 6 mg/m3 of COS or RHS or any corrosive sulfur species (as S) shall be found at any time then total Sulfur shall be measured continuously using an ASTM standard (ASTM D7493 or ASTM D7165 – 10). A full laboratory Sulfur species analysis shall be performed with any significant change of gas quality.
AutoNDA by SimpleDocs

Related to Total Sulfur and Sulfur species

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Base Building Work Landlord shall construct the Base Building Work as further set forth on Exhibit 10.03, attached.

  • Budget For Tenant Improvements A preliminary detailed breakdown by trade of the costs incurred or that will be incurred in connection with the design and construction of the Tenant Improvements is set forth on Schedule 3 attached hereto (the “Budget”). The Budget is based upon the TI Construction Drawings approved by Tenant and shall include a payment to Landlord of administrative rent (“Administrative Rent”) equal to 1.5% of the TI Costs, which Administrative Rent shall include, without limitation, all out-of-pocket costs, expenses and fees incurred by or on behalf of Landlord arising from, out of, or in connection with monitoring the construction of the Tenant Improvements and Changes, and shall be payable out of the TI Fund. Landlord shall provide Tenant with a final Budget promptly following approval of the TI Construction Drawings by Landlord and Tenant. The Budget shall be subject to Tenant’s review and approval which approval shall not be unreasonably withheld, conditioned or delayed by Tenant. Tenant shall have the right to approve any use of the contingency in the Budget by Landlord; provided, however, that, Tenant’s approval shall not be unreasonably withheld, conditioned or delayed, and the contingency shall not be available for use by Tenant for any Changes until all unforeseen conditions, changes to resulting from governmental agencies and the like have first been paid for out of the contingency.

  • PROCEDURES SPECIFIC TO CUSTOM BASKETS The Fund has developed custom creation, redemption and other non-typical baskets (the “Custom Baskets”). Custom Baskets are intended to allow the Participant to transact in a Fund and other non-standard baskets using the Custom Basket process. The Custom Basket process allows for cash-in-lieu for certain securities as well as non-typical baskets and continues to settle through the standard CNS process at NSCC. It is the responsibility of the Participant to apply to the NSCC by contacting DTCC Participant Services at 000-000-0000 and the Transfer Agent at 000-000-0000 to allow them to receive Custom Baskets as well as the regular daily standard baskets (the “Standard Baskets”). To ensure proper tracking of a Fund to its benchmark index the following guidelines must be followed when transacting Custom Baskets:

  • Base Building “Base Building” means the Building Structure and Mechanical Systems, collectively, defined as follows:

  • Product Specifications The Company agrees that all Products sold to Xxxx hereunder shall conform to the respective specifications set forth on Schedule A or to such other specifications as are from time to time agreed upon by the Parties.

Time is Money Join Law Insider Premium to draft better contracts faster.