Solar System Summary Sample Clauses

Solar System Summary. The solar PV systems installations will be installed as illustrated in the Site Layout Plans provided in Section 4.13. Any changes to the location, size, or orientation shall constitute a Change Order. In summary, the solar PV systems will include the following:
AutoNDA by SimpleDocs
Solar System Summary. The Xxxxxxx Elementary solar installation will include one (1) electricity grid-connected photovoltaic system with a rated capacity of 106.20 kW-DC-STC. The installation will consist of 20 degree fixed tilt, ground mounted array. The photovoltaic system is expected to supply approximately 160,200 kWh of electricity to the grid in the first year. Please see attached drawing for System layout and performance. The Willows Intermediate School solar installation will include one (1) electricity grid- connected photovoltaic system with a rated capacity of 135.7 kW-DC-STC. The installation will consist of 20 degree fixed tilt, ground mounted array. The photovoltaic system is expected to supply approximately 200,764 kWh of electricity to the grid in the first year. Please see attached drawing for System layout and performance. The Willows High School solar installation will include one (1) electricity grid-connected photovoltaic system with a rated capacity of 200.6 kW-DC-STC. The installation will consist of 10 degree fixed tilt, shade structure mounted array. The photovoltaic system is expected to supply approximately 293,760 kWh of electricity to the grid in the first year. Please see attached drawing for System layout and performance. In general, the System will consist of the following: • PV modules • PV module support systemGround mount and/or shade structures • Combiner boxes • Inverter(s) • System electrical protection • Electrical disconnects • Switchgear • Revenue grade AC metering • Meteorological (MET) stations • Control and monitoring systemsComputer Monitoring for system information installed in main office (Customer to provide internet access) • Outdoor rated equipment enclosures • Cables, wires, jumpers, connectors, system grounding and associated trenching and/or boring • Equipment foundations • Lighting • Signage • Six foot (6’) security cyclone fence with access gates (ground mount systems and inverters) Engineering Design Services The Contractor shall be responsible for detailed design and operational coordination of all equipment and materials installed for the System. The Contractor shall conform to Industry Standard and Applicable Law. The following design services shall be provided by the Contractor:
Solar System Summary. The solar PV systems installations will be installed as illustrated in the Site Layout Plans provided in section 5.14. In summary, the solar PV systems will include the following:

Related to Solar System Summary

  • System Access CUSTOMER agrees to provide to PROVIDER, at CUSTOMER’S expense, necessary access to the mainframe computer and related information technology systems (the “System”) on which CUSTOMER data is processed during the times (the “Service Hours”) specified in the PSAs, subject to reasonable downtime for utility outages, maintenance, performance difficulties and the like. In the event of a change in the Service Hours, CUSTOMER will provide PROVIDER with at least fifteen (15) calendar days written notice of such change.

  • Service Descriptions Available services for Transitional and Enhanced Supervision Services a. One (1) one-to-one meeting with the Contractor per week for case management services.

  • Service Description The Parties will provide Common Channel Signaling (CCS) to one another via Signaling System 7 (SS7) network Interconnection, in accordance with prevailing industry standards. Use of a third party provider of SS7 trunks is permitted.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • XXX Hosting 10.1 XXX Hosting is not required for resale in the BellSouth region.

Time is Money Join Law Insider Premium to draft better contracts faster.