Schedules and Space Temperature Set Points Sample Clauses

Schedules and Space Temperature Set Points. Building occupancy schedules and space temperature set points have been established to provide comfort during occupied hours and to minimize energy use during unoccupied hours. The Owner agrees to adhere to these schedules and set points as shown below in order to maintain the energy savings guarantee. Holidays shall be determined by the District calendar. Space Temperature Set Point Space Type Mode Days Hours Summer - Cooling Winter - Heating Classrooms, Corridors, Offices, Occupied Mon-Fri 7AM - 4PM 74°F ± 2°F 70°F ± 2°F Conference Rooms, Reading Unoccupied Mon-Fri 12AM-7AM; 4PM-12AM 82°F ± 2°F 62°F ± 2°F Room, Cafeteria, Staff Rooms Sat/Sun/Hol All 82°F ± 2°F 62°F ± 2°F Gyms, Locker Rooms, Auditorium, Multipurpose Occupied Occupied Mon-Fri Mon-Fri 7AM - 4PM Events (up to 30 per year) 76°F 76°F ± 2°F ± 2°F 68°F 68°F ± 2°F ± 2°F Rooms Unoccupied Mon-Fri 12AM-7AM; 4PM-12AM 82°F ± 2°F 60°F ± 2°F Sat/Sun/Hol All 82°F ± 2°F 60°F ± 2°F Board Room Occupied Mon-Fri (1) 7AM - 4PM 76°F ± 2°F 68°F ± 2°F Mtg Days 5PM - 10PM 74°F ± 2°F 70°F ± 2°F Unoccupied Mon-Fri (1) 12AM-7AM; 4PM-12AM 82°F ± 2°F 60°F ± 2°F Sat/Sun/Hol All 82°F ± 2°F 60°F ± 2°F Food Pantry Occupied Mon-Fri 7AM - 4PM n/a 68°F ± 2°F Unoccupied Mon-Fri 12AM-7AM; 4PM-12AM n/a 60°F ± 2°F Sat/Sun/Hol All n/a 60°F ± 2°F Storage areas, Vestibules All All All n/a 60°F
AutoNDA by SimpleDocs

Related to Schedules and Space Temperature Set Points

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • ESTIMATED / SPECIFIC QUANTITY CONTRACTS Estimated quantity contracts, also referred to as indefinite delivery / indefinite quantity contracts, are expressly agreed and understood to be made for only the quantities, if any, actually ordered during the Contract term. No guarantee of any quantity is implied or given. With respect to any specific quantity stated in the contract, the Commissioner reserves the right after award to order up to 20% more or less (rounded to the next highest whole number) than the specific quantities called for in the Contract. Notwithstanding the foregoing, the Commissioner may purchase greater or lesser percentages of Contract quantities should the Commissioner and Contractor so agree. Such agreement may include an equitable price adjustment.

  • Five Day Work Week Schedule When working under the five (5) day work week schedule, Employees shall receive one and one-half (1.5x) times their regular rate of pay for the first two (2) hours of overtime Monday through Friday. All other overtime Monday through Friday shall be paid at double time (2x).

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Voltage Schedules Once the Developer has synchronized the Large Generating Facility with the New York State Transmission System, NYISO shall require Developer to operate the Large Generating Facility to produce or absorb reactive power within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria). NYISO’s voltage schedules shall treat all sources of reactive power in the New York Control Area in an equitable and not unduly discriminatory manner. NYISO shall exercise Reasonable Efforts to provide Developer with such schedules in accordance with NYISO procedures, and may make changes to such schedules as necessary to maintain the reliability of the New York State Transmission System. Developer shall operate the Large Generating Facility to maintain the specified output voltage or power factor at the Point of Interconnection within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria) as directed by the Connecting Transmission Owner’s System Operator or the NYISO. If Developer is unable to maintain the specified voltage or power factor, it shall promptly notify NYISO.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.