- Regional Conservation Measure Workshop Sample Clauses

- Regional Conservation Measure Workshop. Following the results of the above analysis, XXX will work with the City to convene a workshop with representatives of the Water Contractors to review the results of the analyses – with particular emphasis on conservation measure/program performance, observed savings, and potential remaining opportunities. During the workshop, XXX will also review the current state of the industry and identify the conservation measures that have and could provide the most water savings value for the region, including conservation measures that will support compliance with Making Conservation a California Way of Life and identifying those measures that most likely will be phased out if they are redundant to requirements imbedded in building and plumbing codes and state law.
AutoNDA by SimpleDocs
- Regional Conservation Measure Workshop. Following the results of the above analysis, EKI will work with the City to convene a workshop with representatives of the Water Contractors to review the results of the analyses – with particular emphasis on conservation measure/program performance, observed savings, and potential remaining opportunities. During the workshop, EKI will also review the current state of the industry and identify the conservation measures that have and could provide the most water savings value for the region, including conservation measures that will support compliance with Making Conservation a California Way of Life and identifying those measures that most likely will be phased out if they are redundant to requirements imbedded in building and plumbing codes and state law.

Related to - Regional Conservation Measure Workshop

  • Interim Measures 6.1 The Parties acknowledge that the British Columbia Claims Task Force made the following recommendation concerning interim measures:

  • Safety Measures Awarded vendor shall take all reasonable precautions for the safety of employees on the worksite, and shall erect and properly maintain all necessary safeguards for protection of workers and the public. Awarded vendor shall post warning signs against all hazards created by the operation and work in progress. Proper precautions shall be taken pursuant to state law and standard practices to protect workers, general public and existing structures from injury or damage.

  • Environmental Protection Measures 5.1.1 All private storm water facilities shall be maintained in good order in order to maintain full storage capacity by the owner of the lot on which they are situated.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Corrective Measures If the Participating Generator fails to meet or maintain the requirements set forth in this Agreement and/or the CAISO Tariff, the CAISO shall be permitted to take any of the measures, contained or referenced in the CAISO Tariff, which the CAISO deems to be necessary to correct the situation.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

Time is Money Join Law Insider Premium to draft better contracts faster.