Reading and Correction of Meters Sample Clauses

Reading and Correction of Meters. 6.10.1 The metering point shall be the Delivery Point at 11 kV/22 kV/ 33 kV and EHV voltage level of MSEDCL / STU substations, as the case may be for respective Unit(s) under the SPV.
AutoNDA by SimpleDocs
Reading and Correction of Meters. (i) The metering point will be at the receiving end of CTU substation. For the purpose of energy accounting the Power Producer shall install ABT compliant meter at the metering point.
Reading and Correction of Meters. (i) The metering point will be at the receiving end of GETCO/ CTU substation. For the purpose of energy accounting the Power Producer shall install ABT compliant meter at the metering point. In case of project getting connected to the grid through internal pooling sub-station of an existing wind farm, the Power Producer shall install ABT meters at the Pooling s/s. Further, there shall be separate arrangement for metering of Wind and Solar Project.
Reading and Correction of Meters. (i) The metering point and interface point for grid connectivity shall be at the point of connection at the nearest GETCO sub-station, where feasibility is available and granted. For interface metering for grid connectivity, the Successful Bidders shall abide by applicable Grid Code, Grid Connectivity Standards, Regulations on communication System for transmission of electricity and other regulations (as amended from time to time) issued by GERC, CERC, CEA, etc. For the purpose of energy accounting, the ABT compliant meter shall be installed at the metering point. Interface metering shall conform to the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2014 and amendment thereto, as stipulated by GETCO. The electricity generated from the WTGs shall be metered and readings taken jointly by Wind Project Developer with GEDA and GETCO at the metering point on a monthly basis. The project developers shall also have to install Remote Terminal Unit (RTU) for transferring the real time data to SLDC for its monitoring purpose. Further, as per GERC Tariff Framework for procurement of power from wind projects, for the purpose of accounting, each WTG shall have to provide ABT compliant meters.
Reading and Correction of Meters i. The metering point shall be at 11 / 22 kV level substation of MSEDCL.
Reading and Correction of Meters i. Hybrid Power Developer shall install ABT compliant meter at the metering point, i.e. 33 kV Bus of MSEDCL/ MSETCL substation for the purpose of energy accounting/billing.
Reading and Correction of Meters. (a) The Distribution Licensee and concerned Rural System Operator shall jointly read the Metering System on the first (1st) day of every month at the delivery point.
AutoNDA by SimpleDocs
Reading and Correction of Meters. (i) The Metering Point, which is the point at which energy supplied to the Procurer shall be measured, shall be the low voltage bus bar of the STU / CTU substation. All expenses including wheeling charges and losses between the Project and the Delivery Point shall be paid by the Power Producer without any reimbursement by the Procurer.
Reading and Correction of Meters. 7.1.1 The metering point shall be at the LV side (33 kV) of the EHV pooling substation. Floating Solar Power Developer shall install ABT compliant meter with Automated Meter Reading (AMR) facility at the metering point, i.e. LV bus at EHV pooling substation for the purpose of energy accounting/billing.
Reading and Correction of Meters. 7.2.1 The metering point will be shall be the Delivery Point / Interconnection Point as defined in Section 1. Biomass Power Generator shall install ABT compliant meter at the metering point for the purpose of energy accounting/billing.