Examples of Central Electricity Authority in a sentence
The maximum current and voltage waveform distortion shall be in accordance with the limits prescribed under Central Electricity Authority (Grid Standards) Regulations 2010, as amended from time to time.
Interface metering shall conform to the Central Electricity Authority (Installation and Operation of Meters) Regulations 2014 and amendment thereto.
Construction Regulation – Central Electricity Authority (Technical Standards for construction of electrical plants and electric lines) Regulation, 2010 (as amended time to time) b.
For interconnection with grid and metering, the SPG shall abide by the relevant and applicable regulations, Grid Code notified by the State Commission and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time, or orders passed thereunder by the Appropriate Commission or CEA.
The Main and Check Meters shall be tested for accuracy as per the Central Electricity Authority (Installation and Operation of Meters)Regulations, 2006.
The BPC shall constitute a committee for evaluation of the bids with at least one member from Central Electricity Authority (CEA) and the concerned Regional Power Committees.
The Main and Check Meters shall be tested for accuracy as per the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006.
Metering arrangement shall be as per Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended from time to time.
The metering arrangements with facilities to record export and import of energy shall be provided in accordance with the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, Tamil Nadu Electricity Regulatory Commission‟s Intra State Open Access Regulations, Tamil Nadu Electricity Distribution Code and Indian Electricity Grid Code / Tamil Nadu Electricity Grid Code in consultation with Distribution Licensee.
The metering arrangements with facilities to record export and import of energy shall be provided in accordance with the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006,Tamil Nadu Electricity Regulatory Commission‟s Intra State Open Access Regulations, Tamil Nadu Electricity Distribution Code and Indian Electricity Grid Code / Tamil Nadu Electricity Grid Code in consultation with STU/Distribution Licensee.