Proposed Location of Construction Sample Clauses

Proposed Location of Construction. Noise Monitoring Stations (Sheet 1 of 2) Figure 2.1.2 Proposed Location of Construction Noise Monitoring Stations (Sheet 2 of 2) Figure 3.1 Mitigation Measures to the Impact on Ardeid Night Roost
AutoNDA by SimpleDocs
Proposed Location of Construction. Air Quality Monitoring Stations (Sheet 1 of 4) Figure 9.1.2 Proposed Location of Construction Air Quality Monitoring Stations (Sheet 2 of 4) Figure 9.1.3 Proposed Location of Construction Air Quality Monitoring Stations (Sheet 3 of 4) Figure 9.1.4 Proposed Location of Construction Air Quality Monitoring Stations (Sheet 4 of 4) Figure 11.1 Complaint Handling Procedures Appendices Appendix A Environmental Mitigation Implementation Schedule Appendix B Sample Environmental Monitoring Data Recording Sheets Appendix C Complaint Log Appendix D Sample Interim Notification of Environmental Quality Limit Exceedances

Related to Proposed Location of Construction

  • Completion of Construction (a) For the purposes of this Agreement, the terms "

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • Commencement and Completion of Construction The Company shall begin Construction Activities no later than January 1, 2014 (“Commencement Date”) and secure a final Certificate of Compliance by June 30, 2015 (hereinafter, “Completion Date”).

  • Rule of Construction No rule of construction requiring interpretation against the drafting Party hereof shall apply in the interpretation of this Agreement.

  • Inspection of construction records The Authority shall have the right to inspect the records of the Contractor relating to the Works.

  • Commencement of Construction Construction of the Project will start within thirty (30) days after notification to the Developer by the Owner, or as soon thereafter as weather and ground conditions permit.

  • Supervision of Construction The Recipient agrees to maintain competent and adequate engineering supervision at the construction site of any Project to ensure that the completed work conforms to the approved plans and specifications.

  • Definitions Construction (a) All initially capitalized terms used herein (including in the preamble and recitals hereof) without definition shall have the meanings ascribed thereto in the Credit Agreement (including Schedule 1.1 thereto). Any terms (whether capitalized or lower case) used in this Agreement that are defined in the Code shall be construed and defined as set forth in the Code unless otherwise defined herein or in the Credit Agreement; provided that to the extent that the Code is used to define any term used herein and if such term is defined differently in different Articles of the Code, the definition of such term contained in Article 9 of the Code shall govern. In addition to those terms defined elsewhere in this Agreement, as used in this Agreement, the following terms shall have the following meanings:

Time is Money Join Law Insider Premium to draft better contracts faster.