Materials Transport Sample Clauses

Materials Transport. Contractor shall transport all collected recyclable materials to market. Contractor shall not, under any circumstances, be allowed to dispose of uncontaminated collected recyclable materials by land filling. If City determines that Contractor has land filled uncontaminated recyclable materials collected through this program, a penalty fee will be assessed at the rate of $100.00 per ton with no maximum, with a minimum of $100.00 per incident.
AutoNDA by SimpleDocs

Related to Materials Transport

  • Materials Stored If the Application for Payment includes materials delivered and suitably stored at the Site but not incorporated in the work, they shall, if required by the Owner or the Design Professional, be conditional upon submission by the Contractor of bills of sale or such other procedure as will establish the Owner's title to such material or otherwise adequately protect the Owner's interest. The Contractor is responsible for the existence, protection, and, if necessary, replacement of materials until execution of the Final Certificate of the Design Professional. The Owner shall not pay for any materials stored off-site.

  • Materials and Supplies The cost of materials and supplies is allowable. Purchases should be charged at their actual prices after deducting all cash discounts, trade discounts, rebates, and allowances received. Withdrawals from general stores or stockrooms should be charged at cost under any recognized method of pricing, consistently applied. Incoming transportation charges are a proper part of materials and supply costs.

  • Transport 6.1.1 BellSouth shall provide nondiscriminatory access, in accordance with FCC Rules 51.311, 51.319, and Section 251(c)(3) of the Act to interoffice transmission facilities described in this Section 6 on an unbundled basis to EZ Phone for the provision of a qualifying service, as set forth herein.

  • Materials and Methods 86 2.1 PARTICIPANTS 87 We used baseline measurements from a convenience sample of participants in previous (3) and 88 ongoing cohort studies investigating the effects of rehabilitation on balance responses (Table 1). PD 89 participants were mild-moderate with bilateral symptoms (Xxxxx and Xxxx stage 2-3 (13)). All 90 participants provided written informed consent and all study procedures were approved by Institutional 91 Review Boards at the Georgia Institute of Technology and Emory University.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • MATERIALS AND WORKMANSHIP Unless otherwise specified, all materials and equipment incorporated in the work under the Contract shall be new. All workmanship shall be first class and by persons qualified in the respective trades.

  • Transportation Transportation expenses include, but are not limited to, airplane, train, bus, taxi fares, rental cars, parking, mileage reimbursement, and tolls that are reasonably and necessarily incurred as a result of conducting State business. Each State agency shall determine the necessity for travel, and the mode of travel to be reimbursed.

  • Services, Materials, and Equipment Unless otherwise specified, the Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities, incidentals, and services necessary for the construction, performance, testing, start-up, inspection and completion of the Work.

  • Recycling If this Agreement provides for the purchase or use of goods specified in PCC 12207 (for example, certain paper products, office supplies, mulch, glass products, lubricating oils, plastic products, paint, antifreeze, tires and tire-derived products, and metal products), this section is applicable with respect to those goods. Without limiting the foregoing, if this Agreement includes (i) document printing, (ii) parts cleaning, or (iii) janitorial and building maintenance services, this section is applicable. Contractor shall use recycled products in the performance of this Agreement to the maximum extent doing so is economically feasible. Upon request, Contractor shall certify in writing under penalty of perjury, the minimum, if not exact, percentage of post consumer material as defined in the PCC 12200, in such goods regardless of whether the goods meet the requirements of PCC 12209. With respect to printer or duplication cartridges that comply with the requirements of PCC 12156(e), the certification required by this subdivision shall specify that the cartridges so comply.

Time is Money Join Law Insider Premium to draft better contracts faster.