Interconnection with Clause Samples

Interconnection with. Du Pont's Plant A. O'Brien shall provide at its expense all equipment and systems necessary to supply electricity to Du Pont's Plant as shown on Exhibit A. Upon completion of construction, O'Brien will convey to Du Pont all of the equipment below the Point of Interconnection as shown on Exhibit A. O'Brien will be responsible for maintenance of all equipment and systems above the Point of Interconnection, and Du Pont will be responsible for maintenance of all equipment and systems below the Point of Interconnection., B. The interconnection facilities shall be designed to generally accepted engineering standards. Du Pont and O'Brien agree to cooperate in determining appropriate and compatible equipment specifications for interconnection facilities; provided, however, that notwithstanding anything to the contrary herein, Du Pont shall not be responsible for any damage to the Facility due to demand from Du Pont's systems. O'Brien will give Du Pont at least forty-five days notice prior to commencing operation and interconnection. Du Pont and O'Brien shall develop written procedures for interconnection, prior to interconnection. Du Pont shall have the right to witness testing and start up of all interconnection facilities. ▇. ▇'▇▇▇▇▇ shall at its expense, and in accordance with Exhibit B, dismantle and remove, including transportation to JCP&L's facilities for storage or disposal in accordance with appropriate regulations, JCP&L's existing 34.5kv substations and transmission lines, and the 2.4kv metering installations from the ▇▇▇▇▇▇ Site. D. The existing 34.5kv feeders supplying the Du Pont plant shall be maintained in operation throughout the construction of the Facility. Shutdowns during feeder relocations should be limited to one feeder at a time and to a maximum duration of twelve (12) hours for any one shutdown. Switchover from the JCP&L a34.5 feeders to O'Brien's 13.8kv feeders shall not be made until O'Brien's generating facility is fully on line and has demonstrated for a sixty (60) day period a 100% ability to meet Du Pont's electric requirements.
Interconnection with. Du Pont's Plant A. O'Brien shall be responsible for all required auxiliary equipment and systems required to supply steam to the point of interconnection with Du Pont's Plant as indicated in Exhibit B. The meter shall be located at or near the point of interconnection. O'Brien will supply and maintain, at its cost, all piping systems and interconnection points with Du Pont's Plant specified on Exhibit B hereto. B. Du Pont will be responsible for the construction, operation and maintenance, at its cost, of the piping and other equipment and apparatus to be located in Du Pont's Plant and required to receive the delivery of steam from the Facility to Du Pont's Plant at the point of interconnection. C. Both Du Pont's and O'Brien's interconnection facilities shall be designed to generally accepted engineering standards. Du Pont and O'Brien agree to cooperate in determining appropriate and compatible equipment specifications for interconnection facilities, provided, however, that notwithstanding anything to the contrary herein, Du Pont shall not be responsible for any damage to the Facility due to demand from du Pont's systems. O'Brien will deliver steam at the interconnection point at 155 psig dry and saturated. O'Brien will provide necessary safety valves and control equipment that will limit steam to a maximum of 165 psig and a maximum steam temperature of 398 DEGREES. O'Brien shall cause these valves to be tested once each year by persons holding a Relief Valve (RV) Stamp from the National Board of Boiler and Pressure Vessel Inspectors and the results of such test shall be supplied to Du Pont. ▇. ▇'▇▇▇▇▇ accepts responsibility for all necessary cleanup and correction of all environmental contamination of Du Pont's property that may result from O'Brien's operations. O'Brien shall not be responsible for any environmental contamination on or within the leased Facility Site if such contamination originated prior to the effective date of the lease.
Interconnection with. Du Pont's Plant A. O'Brien will be responsible for the maintenance of all equipment and systems above the Point of Interconnection as shown on Exhibit "A" to the Du Pont Contract. ▇. ▇'▇▇▇▇▇ will provide any reasonable assistance and support required by NPI to enable NPI to implement and further develop the written operating procedures referred to in Article VI.B of the Du Pont Contract.

Related to Interconnection with

  • Interconnection 2.1 This section applies to linking with suppliers providing public telecommunications transport networks or services in order to allow the users of one supplier to communicate with users of another supplier and to access services provided by another supplier, where specific commitments are undertaken.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct.

  • Interconnection Customer (1) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: None (2) In the event that, in accordance with the Interconnection Construction Service Agreement, Interconnection Customer has exercised the Option to Build, it is hereby permitted to build in accordance with and subject to the conditions and limitations set forth in that Section, the following portions of the Transmission Owner Interconnection Facilities which constitute or are part of the Customer Facility: None Ownership of the facilities built by Interconnection Customer pursuant to the Option to Build shall be as provided in the Interconnection Construction Service Agreement.